EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Nashville, Tennessee. Completed plans call for the renovation of a educational facility.

**As of April 22, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Multiple Buildings Roof Replacement If the initial Contract Sum as awarded exceeds $100,000, the successful Bidder shall provide Contract Bond in an amount of 100 percent of Contract Sum and in accordance with the requirements and form exhibited as Section 00 61 13. Bid Security is required in the amount of five percent (5%) of total amount of bid, including alternates, in the form of a Bid Bond or check (certified or cashier's)made payable to State of Tennessee. 1.01 Replace the existing low-slope EPDM roofs at Operations Building and Hale Hall. 1.02 Work includes, but is not limited to removal of the existing single-ply membranes, all insulation, edge metal, metal copings, gutters and downspouts to the existing deck. Provide new vapor barrier at locations shown on Plans. Provide flat stock, tapered isocyanurate insulation and HD iso coverboard. Provide and install a fully adhered, low slope fire retardant (LSFR), non-reinforced, black, .090" EPDM Roof System over cover board. System to be installed per Manufacturer's recommendations to achieve a 30-Year No-Dollar-Limit, Total-System Warranty.Provide new edge metal, gutters, downspouts and overflow scuppers at locations shown on Plans. Perform other specified work items as shown on the Plans. 1.03 Keep work area and grounds clean at all times and protect inside and outside of facility from damage. The facility must remain occupied and dry during the work. Contractor shall not interfere with Owner's normal day-to-day operations of the building. Contractor will be provided an area on-site for storage of materials, if so desired. 1.04 The Contractor shall conform to OSHA and other safety requirements during this Project. Keep all tools, equipment, materials and personnel (as practicable)away from roof perimeters to prevent damage or injury on the construction Site and to protect the structure and public below. 1.05 Contractor is responsible for providing all necessary barricades on the roof and on the ground to meet OSHA requirements and protect people on the ground. Owner and Designer are not responsible for Contractor's safety. 1.06 Contractor's Use of Premises: Staging area(s) will be provided, to be coordinated with Owner (see Plans). 1.07 Coordinate all work with Local Officials and the Owner. Owner must continue to occupy building during the work of this Contract. Contractor shall keep buildings dry and free of debris at all times. 1.08 Contractor's employees shall have no interaction with Building employees/occupants/students. Contractor's employees shall keep all trash in proper containers on roof. Inappropriate comments and/or actions will be reason to remove Contractor's Employee from the jobsite. 1.09 TSU is a tobacco free Campus. Contractor may only use tobacco products in vehicles. 1.10 Contractor is responsible for repairing Building surfaces and lawns damaged due to Contractor's work. Damaged lawns are to be filled with new topsoil, raked and seeded. Contractor shall water newly seeded areas to insure a good stand of grass during the one-year Warranty period. 1.11 All Contractor's work areas, material storage areas and other areas of work shall be barricaded off to ensure Building employees/occupants/students do not accidentally pass into the work areas. 1.12 Contractor shall coordinate all deliveries with TSU. TSU is not responsible for receiving Contractor's deliveries. Delivery of materials shall not interfere with operation of School. Contractor shall be present when all materials are delivered. All materials shall be properly stored at location designated by TSU. 1.13 TSU Campus representative is Marlah Green (615-594-8419). 1.14 In General, work hours shall be 8:00 AM to dark. During summer months, Contractor may start work earlier to avoid excessive heat. Weekend work shall be coordinated with Owner and Security. 1.15 Contractor shall pick up nails and debris daily or more often if required. Contractor will be responsible for any damage to tires from nails in parking lot.

Bid Results

Educational

$590,000.00

Public - State/Provincial

Renovation

12

20

2

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Flashing and Sheet Metal
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
40
Bidding Soon
754
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 2, 2025

img_map_placeholder

3500 John A Merritt Blvd, Nashville, TN

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Multiple Building Roof Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.