Published December 3, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Perry, Oklahoma. Completed plans call for site work for a water / sewer project.

Item Description Unit Quantity 1 8" PVC SDR 26 L.F. 1,739 2 4' Dia. M.H. E.A. 7 3 Additional Depth M.H. V.F. 32 4 Bore and Install 20" Steel Casing L.F. 180 5 Trenching L.F. 1,559 6 Mobilization L.S. 1 7 Erosion Control L.S. 1 8 Trafc Control L.S. 1 9 Bermuda Grass Sodding S.Y. 2080 10 Sewer Testing L.S. Each bidder must submit their original bid, lodged with the City of Perry, Perry Municipal Authority, accompanied by a certifed or Cashier's Check from a solvent Oklahoma bank, or a Bidder's Bond. This bond must be equivalent to fve (5) percent of the bid amount, serving as a guarantee of the bidder's capability to fulfll the contract bid and enter into a written agreement with the Owner. Construction, Maintenance, Payment, and Statutory Payment Bonds, amounting to 100% of the contract price, are mandatory for this project. These bonds must be secured from a Corporate Surety licensed in Oklahoma and approved by the Owner and Consulting Engineer. The Owner reserves the right to reject any or all bids, waive irregularities in bids deemed to be in the best interests of the Owner, and reject nonconforming, nonresponsive, or conditional bids. In the event of ambiguity or lack of clarity in bid pricing, the Owner reserves the right to interpret bids in the most advantageous manner or reject them outright. Unreasonable or unbalanced unit prices will be grounds for rejecting any bid or bids.

Award

Water / Sewer

$341,507.00

Public - City

Site Work

17

18

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Trenchless Utility Installation, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
46
Bidding Soon
555
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 2, 2024

img_map_placeholder

32nd St, Perry, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sanitary Sewer Improvements 32nd Street Sewer Main Extension

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.