Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2025 at 7:00 PM
Updated February 19, 2025
Site work and paving for a road / highway in Perry, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Noble Calendar Days: 120 Days Resurface (Asphalt) US-77: From 3.6 Miles South of US-412, Extend North Near Perry. Project Length = 8.000 Miles DBE Goal: -- Question Deadline 12/27/2024 - Please Submit Your Questions Through the ODOT Pre-bid Email Address: Odot-prebid.question@odot.org. Unless Otherwise Specified in the Proposal, All Bids Must Be Submitted With a Proposal Guaranty Equal to 5 % of the Bid Total. OKDOT - 225 - Resurface (Asphalt) - US-77 This work consists of providing electronic data for material weight tickets of all bituminous material delivered to the project. This work also consists of placing an identifying vehicle number on the driver side and the passenger or rear sides of the delivery vehicle. These provisions do not preclude or dismiss any requirement for paper tickets required by the Standard Specifications or other rules and regulations. This work consists of providing and placing reflectorized and non-reflectorized plural-component pavement markings on asphalt concrete (AC) and portland cement concrete (PCC) pavement surfaces. Plural-component pavement markings includes multiple varieties of both fast setting and slow setting hybridized epoxies, modified urethanes/polyacrylates, methylmethacrylates (MMA), polyurea, or any other applicable plural-component materials approved by the Department. This work consists of obtaining and providing construction traffic surveillance by the Oklahoma Highway Patrol (OHP) on highway construction projects. The use of OHP and the number of patrol cars required on the project is at the approval and/or discretion of the Engineer.
Award
Roads / Highways
$2,587,033.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2025
March 10, 2025
US-77, Perry, OK
Related To This Project
Perry, OK
Bid Date: Jul 02 2025
Perry, OK
Bid Date: Jul 11 2025
Perry, OK
Bid Date: Jul 11 2025
Perry, OK
Bid Date: Jul 22 2025
Perry, OK
Bid Date: Jul 02 2025
Perry, OK
Bid Date: Sep 11 2025
Perry, OK
Bid Date: Nov 01 2024
Perry, OK
Bid Date: Sep 03 2024
Perry, OK
Bid Date: Aug 16 2024
Perry, OK
Bid Date: Aug 14 2024
Perry, OK
--
Perry, OK
Bid Date: Dec 22 2023
Perry, OK
Bid Date: Nov 15 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
