Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 4, 2024 at 7:00 PM

Updated December 6, 2024

Site work for a water / sewer project in Covington, Louisiana. Completed plans call for site work for a water / sewer project.

Slemmer Rd. Drainage Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by installing/repairing drain pipe, catch basin, water meter, and installing rip rap and sod located on Slemmer Rd A Bid Guarantee of five percent (5%) of the amount of the total Bid, including Alternates, must accompany the Proposal and, at the option of the Bidder, may be a cashier's check, certified check or a satisfactory Bid Bond Question Deadline 10/21/2024 at 2:00 PM CT Further, any questions or inquires must be submitted via fax to 985- 898-5227, or via email to Procurement@stpgov.org. Bidders are urged to promptly review the requirements of this specification and submit questions for resolution as early as possible during the bid period. Questions or concerns must be submitted in writing to the Procurement Department no later than 2:00 CST seven (7) working days prior to the bid opening date The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.

Award

Water / Sewer

$315,860.00

Public - County

Site Work

11

6

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
116
Bidding Soon
1,081
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 2, 2024

Project location map

Slemmer Rd, Covington, LA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed