EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Yucaipa, California. Completed plans call for site work for a water / sewer project.

Reference Number: 0000365518 The contract work to be done shall consist of furnishing all labor, materials, necessary tools, equipment, supervision, appurtenances, and all utility and transportation services required for asphalt concrete pavement, site grading to include export, concrete v-ditch, concrete drainage structures, grouted and ungrouted riprap, RCP storm drain, CMB access road/ramp, DG paths and trail construction, tubular steel posts, fence and gate construction, grading and drainage improvements in accordance with the Plans, Drawings, Specifications and other provisions of the Contract Job Location The proposed basin project is located in the City of Yucaipa, south of Wildwood Canyon Road and approximately 800' east of Oak View Road. Engineer's Estimate between $2,300,000.00-$2,500,000.00 Question Deadline 10/29/2024 at 12:00 PM PT Questions are submitted online : Yes . Questions are submitted online : Yes . If you have any questions regarding this matter, please contact Debbie Shortlidge at (909) 797-2489 extension 254. You may contact any reproduction company to download these documents for reproduction purposes at your cost. Liquidated Damages There will be a Five Hundred Dollar ($500.00) assessment for each calendar day that work remains incomplete beyond the time stated in the Proposal Form. Refer to the Proposal Form for specific details. Prevailing Wages In accordance with the provisions of Section 1770 ET. seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all workers on the project sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code Part 7, Chapter 1, Article 2, Sections 1770, 1773, 1773.1". A copy of said document(s) is on file and may be inspected in the office of the City Engineer, located at 34272 Yucaipa Boulevard, Yucaipa, California, 92399. Attention is directed to the provisions of Section 177.5 and 177.6 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor. The Contractor shall provide insurance in accordance with these Specifications. In addition, the Contractor shall guarantee all work against defective workmanship and materials furnished by the Contractor for a period of one (1) year from the date the work was completed in accordance with Sections 2-4 and 6-8 of the Standard Specifications for the Public Works Construction. The Contractor's sureties for the "Performance Bond" shall be liable for any work that the Contractor fails to replace within a specified time. The City of Yucaipa reserves the right to reject any or all bids, to award each item separately, and/or waive any informality on any bid. No bid may be withdrawn for sixty (60) days after the time set for the opening thereof. Failure by the successful bidder to enter into a contract with the City, or to deliver goods and/or services in accordance with the bid may result in a declaration by the City that the bidder is not a responsible bidder and elimination from consideration in future bidding. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$2,500,000.00

Public - City

Site Work

10

9

7

5

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
112
Bidding Soon
1,654
All Active Projects
847
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, Yucaipa, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upper Wildwood Creek Basin 4

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.