Published December 6, 2024 at 7:00 PM

Updated December 7, 2024

Site work for a water / sewer project in Keeseville, New York. Completed plans call for site work for a water / sewer project.

SCOPE OF WORK: Replace existing intake structure and portion of transmission main, along with site work. Bids are requested for the following Contract: General Construction (GC). The Owner reserves the right to accept or reject any or all bids. Question Deadline 11/08/2024

Bid Results

Water / Sewer

$1,106,000.00

Public - City

Site Work

9

18

13

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Substitution Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing, Louvers and Vents
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Hooks

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
92
Bidding Soon
1,414
All Active Projects
567
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

Multiple Locations, Keeseville, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.