BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2024 at 7:00 PM

Updated December 19, 2024

Site work for a service station / car wash facility in Harleyville, South Carolina. Completed plans call for site work for a service station / car wash facility.

Cost Range: $80,000 to $100,000 Electrical Work to prepare for Electric Bus Charging Stations located in Dorchester 4 School *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Provide new electrical service and distribution system for EV Bus Charging Stations. Scope of work is indicated in the Contract Documents.

Award

Service Station / Car Wash

$32,597.00

Public - State/Provincial

Site Work

5

10

2

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
2
Bidding Soon
668
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

January 15, 2025

Project location map

4128 US-78, Harleyville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.