BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Renovation of a civil project in Chino, California. Completed plans call for the renovation of a water / sewer project.

IFB for the Construction of the Central Plant Cooling Tower Replacement Project No. EN23003 Response Format Electronic Bid Valid 90 Calendar Days Liquidated Damages Yes, See IFB for details. Estimated Bid Value $1,970,822.00 Start/Delivery Date Project Duration 545 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 01/15/2026 5:00 PM (PST) The Work consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, install, commission, start up and deliver a complete and fully functional project in accordance with Bid Documents. Cooling Tower CT-1A/1B condition has severely deteriorated and reached the end of its useful life. The said cooling tower can no longer provide desired cooling needs. This tower is needed to operate four adsorption chillers, two mechanical chillers and support the HVAC system currently in place. The scope of the Work is to address the necessary repairs and upgrades at the Central Plant: 1. Demolition and removal of existing components: a. Old cooling tower b. Two cooling tower water pumps c. Associated piping, supports, controls, and electrical equipment. d. Related structural pads and pedestals. e. Water filtration system f. Other items per plans and specifications 2. The installation of the following components a. New two-cell cooling tower to connect in parallel with the existing cooling tower. b. Two new cooling tower water pumps c. New control panels for equipment and VFDs with side mounted air conditioning units d. Upgrades of mechanical piping, electrical, and control systems e. New cover/canopy to protect miscellaneous electrical and control panels from weather elements and rain. f. Structural pad to support the above items. g. Other items per plans and specifications The site of the Work is located IEUA's Headquarters Building (HQ) B in the City of Chino. The Central Plant is adjacent to the Regional Water Recycling Plant No. 5 (RP-5).

Award

Water / Sewer

$1,874,850.00

Public - City

Renovation

1

8

10

11

Subscribe For Documents

75 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
21
Bidding Soon
2,360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 30, 2026

Project location map

6075 Kimball Ave, Chino, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.