BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Chino, California. Completed plans call for the renovation of a municipal facility.

Interior Painting of IEUA Headquarters Buildings A & B - The project involves interior painting of two HQ buildings located at 6075 Kimball Avenue, Chino, California 91708. The scope includes surface preparation, application of primer and paint, cleanup, and inspection of all interior walls, ceilings, and trim a. Building 1: HQ-A: Total area to be painted: 44,450 sq ft b. Building 2: HQ-B: Total area to be painted: 46,250 sq ft Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 11/01/2024 at 12:00 PM PT Online Q&A Yes Work Areas The painting project will cover the following areas within each building: a. Building 1 HQ-A: i. Office spaces ii. Conference rooms iii. Hallways iv. Ceilings v. Common areas b. Building 2 HQ-B: i. Private offices ii. Conference rooms iii. Hallways iv. Ceilings v. Common areas (lobby, waiting rooms) vi. Reception area 1. Surface Preparation a. Cleaning: Hand wash all drywall surfaces with mild detergent or degreaser, ensuring no sanding, repairing, or scraping. b. All surfaces (walls, ceilings, trim, doors) will be cleaned and prepared prior to painting. This includes: i. Patching holes, cracks, and surface defects ii. Sanding rough spots and previously painted areas iii. Removing dust, debris, or grease iv. Protecting floors, furniture, and fixtures with drop cloths, tape, and plastic coverings v. Caulking and sealing around windows, doors, and trim 2. Priming a. Apply one coat of primer to any new drywall or surfaces that require it based on surface conditions and previous coatings. 3. Painting a. Paint all designated areas with low-VOC materials and paint sheen as per the Agency's color selection. b. Apply a minimum of two coats of paint unless otherwise specified. c. Ensure smooth and even coverage without streaks, runs, or missed spots. 4. Finishing a. Inspect for touch-ups and address any uneven coverage or surface defects. b. Remove painter's tape and plastic coverings and ensure no damage to adjoining surfaces. c. Clean and reinstall any fixtures, switch plates, etc., that were removed for painting. 5. Final Inspection and Touch-ups a. Conduct a walkthrough with the client or client's representative to review all work. b. Address any final touch-ups or corrections identified during the walkthrough. c. Submit a final sign-off once the client is satisfied. 6. Materials and Equipment a. Contractor is responsible for providing all paint, primers, brushes, rollers, tape, coverings, ladders, scaffolding, and other necessary equipment. b. The client will specify the brand and finish of paint if required. c. All materials will meet the required safety and environmental standards (low-VOC, if requested). 7. Schedule a. Start Date: December 2024 b. Completion Date: February 2025 c. Contractor will provide a detailed work schedule for each building prior to the start date. d. Work hours will be from 7:00 am - 5:00 pm Monday - Friday, ensuring minimal disruption to building occupants

Sub-Bidding

Municipal

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
118
Bidding Soon
2,132
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

December 2, 2024

img_map_placeholder

6075 Kimball Ave, Chino, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.