BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2024 at 7:00 PM

Updated December 14, 2024

Site work and new construction of a municipal facility in Lockport, New York. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of November 11, 2024, this project has not yet been awarded. The project is expected to be awarded on November legislative meeting on November 12, 2024. SCOPE INCLUDES: site clearing; earth moving; dewatering; excavation support & protection; asphalt paving; pavement joint sealants; concrete paving; soil preparation; turfs & grasses; utility id; water utility piping; site sanitary sewerage piping; stormwater conveyance; concrete forming & accessories; concrete reinforcing; cast in place concrete; unit masonry; structural steel framing; steel joist framing; steel decking; cold formed metal framing; pipe & tube railings; sheathing; plastic laminate clad architectural cabinets; thermal insulation; weather barriers; standing seam metal roof panels; formed metal wall panels; insulated metal wall panels; soffit panels; fiber cement siding; EPDM roofing; sheet metal flashing & trim; joint sealants; hollow metal doors & frames; flush wood doors; sectional doors; fiberglass sandwich panel assemblies; unit skylights; door hardware; glazing; non structural metal framing; gypsum board; ceramic tiling; acoustical panel ceilings; specialty ceilings; resilient base & accessories; resilient tile flooring; tile carpeting; exterior painting; interior painting; staining & transparent finishing; room ID panel signage; phenolic core toilet compartments; toilet bath & laundry accessories; fire protection cabinets; fire extinguishers; wood lockers; phenolic lockers; roller window shades; plastic laminate clad countertops; quartz agglomerate countertops; entrance floor mats & frames; metal building systems WAGE = prevailing wage TAX = tax exempt SCHEDULE = All work to be completed by 12/31/2025 Project Location: 225 South Niagara Street, Lockport, New York 14094 Bid Results : General : Picone Construction Corp - $ 9,220,000 Mechanical : Parise Mechanical - $1,989,000 Electrical : Concord Electric Corp - $2,994,000 Plumbing : JR Swanson Plumbing - $1,136,560

Award

Municipal

$15,339,560.00

Public - County

New Construction, Site Work

171

25

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
291
Bidding Soon
4,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 2, 2024

Project location map

225 S Niagara St, Lockport, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.