EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Snohomish, Washington. Completed plans call for the renovation of a water / sewer project.

The City of Snohomish is seeking a contractor to furnish all labor, tools, materials, and equipment necessary to complete the Motor Control Center (MCC) and Generator Replacement project at the Snohomish Wastewater Treatment Plant (WWTP). The work to be performed under this contract includes, but is not limited to, the following: o Measures for temporary erosion and sediment control. o Remove and salvage the existing emergency generator to the Owner and demolish associated appurtenances, duct, conduit, wire, and fuel piping inside the existing Generator Building. o Demolish the existing diesel storage tank and associated appurtenances, bollards, conduit, wire, and fuel piping. o Repair of the existing Generator Building roof following demolition of the existing generator exhaust duct. o Demolish the Generator Building inlet and exhaust louvers and replacement with new wall sections and windows. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the grand total amount of such bid proposal, AND LIST OF SUBCONTRACTORS. NO BID SHALL BE CONSIDERED UNLESS ACCOMPANIED BY SUCH BID PROPOSAL DEPOSIT. If the successful bidder does not enter into a contract and file a performance and payment bond and the required insurance certificates, with the City of Snohomish within ten (10) working days after Notice of Award of Bid, the amount of the bid deposit shall be forfeited to the City of Snohomish. Unsuccessful bidders' deposits will be returned upon City's execution of contract documents or rejection of all bids. A one hundred percent (100%) Contractor's Performance and Payment Bond is required. The bond must be delivered to the Snohomish City Clerk within ten (10) working days after notification of the award to the successful bidder. The Bond must be approved by City officials before the contract award is final. A Contract is required and must be executed and returned to the City of Snohomish within ten (10) working days after notification of award. Engineer's Estimate: $1,300,000 The City of Snohomish reserves the right to reject any or all bids, and to waive irregularities or informalities in the bid or in the opening. The City of Snohomish reserves the right to delete portions of the work. No bidder may withdraw his bid after the hour set for the opening thereof, or before award of contract, unless said award is delayed for a period exceeding sixty (60) calendar days. The bidder further agrees to begin work within ten (10) working days after Notice to Proceed has been issued by the City of Snohomish. The Contractor has Two Hundred Twenty (220) working days to complete the construction of the project. Bid Package and technical related questions can be directed to Project Engineer, Cory Morton, P.E., at (360) 282-3196. Questions must be received no later than 5:00 PM (Pacific Time) on Tuesday, February 4 th 2025. Questions received after this date will not be answered.

Post-Bid

Water / Sewer

$1,300,000.00

Public - City

Renovation

83

24

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
69
Bidding Soon
1,009
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

April 14, 2025

img_map_placeholder

2129 2nd St, Snohomish, WA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Plant Motor Control Center and Generator Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.