BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Lynchburg, Virginia. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The proposed repairs of the John Lynch Bridge over the James River include replacing the current metal plate assembly expansion joints located at Piers 9 and 12 (NBL), Pier 15 (NBL & SBL), and Abutment C (NBL & SBL) with a strip seal expansion joints. The existing raised median located at the centerline of the bridge between Abutment A and Pier 12 will be replaced in its entirety along with a new longitudinal joint system. A shared use path is planned for the NBL with a 1'-0" parapet and railing system that will separate vehicular traffic from pedestrians and bicyclists. A pedestrian fence will be added to the existing downstream parapet adjacent to the planned shared use path. A sand epoxy overlay and concrete surface color coating will be placed on the top of the deck/raised medians and parapets, respectively. The structural steel members will be prepared, primed, and spot painted at the bearings. All of these repairs will take place within the limits of the bridge structure with no land disturbance anticipated for this project. All requests for clarification of or questions regarding this Advertisement for Bids or for additional information must be made in writing to Will Ruberry, william.ruberry@lynchburgva.gov and received by 2:00 PM, November 13, 2024. All addenda should be signed and accompany any bid submitted. Bidder's Bid Bond for 5% of Base Bid Amount That the Contractor shall commence Work within ten (10) days after Notice to Contractor to Proceed with the Work under Contract ("Notice to Proceed"), and shall substantially complete the Work within 473 calendar days. Owner and Contractor recognize that time is of the essence of this Contract and that the Owner will suffer financial loss if the Work is not completed within the times specified plus any extensions thereof. They also recognize the delays, expense and difficulties involved in providing the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for certain losses Owner is expected to suffer due to delay (but not as a penalty) Contractor shall pay $1,500.00 for each day that expires after the time specified for completion. If the Contractor is subject to liquidated damages, the City has the right, but not the obligation, to withhold the liquidated damages from the Contractor's regular payments or retainage. Rights and obligations relating to these liquidated damages are set out more fully in the General Conditions. PN - 23004-BR Plan Holders List not maintained.

GC Bidding

Bridges / Tunnels

$600,000.00

Public - City

Paving, Site Work

39

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
27
Bidding Soon
385
All Active Projects
177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

December 20, 2024

img_map_placeholder

John Lynch Memorial Bridge, Lynchburg, VA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.