BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Yerington, Nevada. Contact the soliciting agency for additional information.

Lyon County is seeking qualified firms to submit qualifications for a Master Services Agreement (MSA) for the following general services: County Engineer County Surveyor Floodplain Management Inspection Services Development Review Assistance The purpose of the MSA is to establish a pool of qualified professionals capable of providing these services to support Lyon County's Community Development Department, Utilities Department, Roads Department, and other associated departments in managing development review, infrastructure and utility review, floodplain management, survey services, inspection services, and other related services. The selected firm shall provide comprehensive engineering and survey services related to development projects, which may include but are not limited to the following: 1. Site Improvement Plan Review: - - - Review and evaluate engineering plans and specifications for site improvement including: grading, drainage, utilities, roadways, access and other infrastructure elements prepared for developments, including, but not limited to subdivision maps, parcel maps, divisions of land into large parcels, building permits, civil improvement plans, conditional use permits, etc. Ensure site improvements plans, engineering studies, and other related documents for the development of property within Lyon County comply with county, state, and federal regulations, standards, and best practices. Provide written comments and recommendations to developers, owners, and county staff. 2. Regulatory Compliance: - - - Verify proposed development projects comply with all applicable local, state, and federal regulations. Assist with the interpretation and application of zoning ordinances, land use regulations, and building codes as directed by Lyon County Staff. Ensure adherence to environmental regulations and stormwater management requirements. 3. Infrastructure and Utility Review: - - - Assess the adequacy of the existing infrastructure and proposed improvements, including water, sewer, stormwater, and transportation infrastructure. The firm shall have knowledge and experience in analyzing the adequacy of the infrastructure using the utility department's water and sewer models. The County's water model runs in Autodesk Infowater Pro in ArcGIS interface and the sewer model in InfoSWMM by Innovyze. Verify utility design meets county, state, and federal standards and specifications. Coordinate with utility providers and other relevant agencies to ensure development projects remain in compliance with the utility and relevant agency regulations. 4. Technical Support and Consultation: - - - Provide technical expertise and support to county staff and officials. Attend meetings with developers, contractors, and stakeholders as directed by Lyon County Staff. Offer guidance on best practices and innovative solutions for site development. 5. Flood Plain Management: - - - - Act as and in assistance to Lyon County designated Flood Plain Administrator or designee to develop and review flood management procedures, documents, and guidelines. Provide recommendations for flood mitigation measures and strategies. Review and approve floodplain development permits as directed by Lyon County staff. Review and approve elevation certificates as directed by Lyon County Staff. 6. Inspection Services: - - - Conduct site inspections to verify construction methods and materials comply with approved plans and specifications. Provide quality assurance and inspection of the following activities: grading, drainage, site improvements, access, and roadway components of developments, including, but not limited to, subdivision maps, parcel maps, divisions of land into large parcels, building permits, improvements plans, etc. Provide geotech/material testing and analysis services for development improvements. Geotech/materials testing and analysis services for grading, drainage, site improvements, access, and roadway components of developments, including but not limited to subdivision maps, parcel maps, divisions of land into large parcels, building permits, improvements plans, etc. 7. Survey Services: - - Act as County Surveyor for review of surveying components of calculations, maps, plans, and appurtenant documents for developments, including, but not limited to subdivision maps, parcel maps, division of and into large parcels, boundary line adjustments, reversion to acreage, building permits, civil improvement plans, etc. Provide professional surveyor and consulting services as directed by Lyon County Staff. 8. Coordination with County Departments: - - Work closely with Lyon County Utilities, Lyon County Roads, Lyon County Community Development, and other related Lyon County agencies/departments to ensure cohesive and comprehensive reviews. Attend meetings with Lyon County staff, developers, and other stakeholders as directed by Lyon County Staff. 9. Project Management Support: - Assist in project management tasks including schedule development, progress tracking, and reporting. III. Submission Requirements Submissions shall include the following information: 1. Cover Letter: - - Summarize the firm's interest in the project and highlight relevant experience. Include the name, title, and contact information of the primary contact person. 2. Firm Qualifications: - - - Provide an overview of the firm, including size, areas of expertise, and history. Describe similar projects completed by the firm and demonstrate experience in providing engineering services for municipal projects, including site improvement plan reviews, floodplain management, survey services, and other related document reviews. Include information on the firm's certifications, licenses, and professional affiliations. 3. Team Composition: Identify the key personnel who will be assigned to this project, including their qualifications and relevant experience. Please include any specific qualifications or experience related to water, wastewater, roads, subdivision design and infrastructure. - Provide resumes for key team members (Resumes may be attached as an appendix and not included in total page limit). - Provide an organizational chart showing key personnel, team structure, and the roles of each member. o Include the current availability or percentage of time available of key prime personnel and their length of time with the firm. 4. Approach and Methodology: - - - - Outline the firm's approach to performing the scope of services. Detail the methodology for conducting technical reviews, inspections, and floodplain administration. Include methods for ensuring quality control and meeting project deadlines. Describe the firm's approach to communication and coordination with county departments and other stakeholders. 5. References: - - - Provide at least three references from clients for whom the firm has performed similar services. Include the name, title, organization, phone number, and email address for each reference. Provide a brief description of the projects completed for each reference. 7. Sample Work Products: - - Include samples of relevant work products, such as technical review reports, inspection reports, and floodplain management documents (Sample work products may be attached as an appendix and not included in total page limit. Provide examples that demonstrate the firm's ability to perform the required services at a high level of quality. 8. Legal and Insurance Information: - - - Provide information on the firm's insurance coverage, including general liability, professional liability, and worker's compensation. Include a statement regarding any past or pending litigation involving the firm. Please identify any potential conflicts of interest related to Lyon County projects or developer projects within Lyon County. Disclose any relationships with developers, property owners, or entities that could impact impartiality. Explain how the engineering firm will manage or mitigate these conflicts to ensure unbiased services to Lyon County. All questions regarding this RFQ must be submitted to Gavin Henderson at ghenderson@lyon-county.org by 5:00 pm (PST) on Monday, November 4, 2024. Responses to all questions will be provided to all prospective applicants.

Conceptual

Municipal

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
11
Bidding Soon
169
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2025

img_map_placeholder

Multiple Locations, Yerington, NV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.