BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Running Springs, California. Contact the soliciting agency for additional information.

State of California Department of General Services Real Estate Services Division Project Management and Development Branch Project Comprises Labor, Material and Services Necessary for: Major Components of Project Work Consist of the Construction of a New Replacement Self-supporting 80 Communication Tower With 20 Mast and 8Lightning Rod (108Total), Foundation, and Feed Line Bridge. Demolition Will Include Removal of Existing Footings, Wooden Poles, and Foundation From the Fallen Tower. The Tower, Microwave, and Antenna Brackets Will Meet Cbc Title 24 Standards and the Requirements Related to the Essential Services Act. Site Work to Include Access Road Maintenance as Necessary. License Required to Bid the Project: a or C-51 Certificate of Reported Compliance (Crc) Fleet Vehicles: as a Condition of Contract Award, Prior to Contract Execution, Contractor Shall Submit Copies of the Valid Crcs for Any Fleet Retained by the Contractor or Any Listed Subcontractor, for Which Any Vehicles Subject to the California Air Resources Board in-use Off-road Diesel Fueled Fleet Regulations, Section 2449(I), Title 12, California Code of Regulations, Are Used in the Completion of the Work Included in the Contract. More Information on the in-use Off-road Diesel-fueled Fleets Regulation Can Be Found at the Following Health and Safety Provisions: Contractor and All Subcontractors Shall Abide by All Health and Safety Mandates Issued by Federal, State, and Local Governments and/or Public Health Officers as Well as Those Issued by Dgs, and Worksite Specific Mandates. If Multiple Mandates Exist, the Contractor and Subcontractors Shall Abide by the Most Restrictive Mandate. The Term employee, worker, state Worker or state Employeein Health and Safety Mandates Includes Contractor and Subcontractor Personnel. Costs Associated With Adhering to Health and Safety Mandates Are the Responsibility of the Contractor. Contractor is Responsible for the Tracking and Compliance of Health and Safety Mandates and May Be Audited Upon Request. Successful Bidder Shall Furnish Payment and Performance Bonds, Each in the Amount of 100 Percent of the Contract Price. Due to limited space on the top of the mountain, we will begin the bid walk by reviewing all project and bidding information in the Children¿s Forest parking lot. After which, we will carpool up to the site. The project site is in the San Bernardino National Forest and is adjacent to the Keller Peak Fire Outlook. Access to the site is by way of Keller Peak Road (Forest Road 1N96) that connects directly to California State Route 18 located east of Running Springs Village and immediately after Deerlick Fire Station. The State¿s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Bidders are required to sign in upon arrival and sign out at the conclusion of the pre-bid site inspection. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid. It is recommended that all vendors register as a bidder through the website at online. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation. Document notes: Drawings and Project Manual may also be viewed through online. Bid open notes: At the public bid opening, all bids received before 2:00 P.M., November 19, 2024 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be emailed to participating contractors immediately after the bid opening. States estimated cost: $2,841,100.00. The term of this project is 300 calendar days. The States Project Director is Aubree French at (916) 919-9636.

Sub-Bidding

Municipal

$2,841,100.00

Public - State/Provincial

Service, Maintenance and Supply

59

14

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
103
Bidding Soon
1,813
All Active Projects
863
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 20, 2024

img_map_placeholder

32573 CA-18, Running Springs, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.