Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 19, 2024 at 7:00 PM

Updated December 20, 2024

Renovation of a water / sewer project in Cincinnati, Ohio. Completed plans call for the renovation of a 721,586-square-foot water / sewer project.

As of December 19, 2024 this project has not yet been awarded,project is expected to be awarded 60 days after the bid opening. A. Material, equipment and tools and services for General, Plumbing, Fire Protection, Heating Ventilating and Air Conditioning, and Electric Work for construction of 1. Fire pump replacement B. Division of the Work among Subcontractors and trades: Without limiting the force or intent of any portion of the General Conditions, refer to Sections 1.2.3 and 1.2.4 thereof. Deadline for Receiving Final ITB - Questions: 10/15/24 A. Material, equipment and tools and services for General, Plumbing, Fire Protection, Heating Ventilating and Air Conditioning, and Electric Work for construction of: 1. Fire pump replacement. General Contractor: Contractor for General Construction. Small Business Participation Requirement: 20% Minority-Owned Business Participation Requirement: 7.9% Women-Owned Business Participation Requirement: 14.5% All work on this project shall be completed ninety [90] days from the date of the "Notice to Proceed" or Contract signing date if they coincide. A surety in the form of a cashier's check drawn on a solvent financial institution, and made payable to the BOARD OF COUNTY COMMISSIONERS, in the amount of 10% (Ten Percent) of the total amount of the bid including any alternates, or a bond in the amount of 100% (One Hundred Percent) of the total amount of the bid including any alternates must accompany each proposal as a guarantee that if the proposal is accepted, a contract will be entered into. The surety must be submitted with the bid. The successful Bidder will be required to furnish a corporate surety bond, made payable to the Board of County Commissioners, Hamilton County, for one hundred percent (100%) of the total amount of the contract price as a guarantee for the faithful performance thereof.

Bid Results

Water / Sewer

$166,742.00

Public - County

Renovation

9

9

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
104
Bidding Soon
2,400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

November 29, 2024

Project location map

Multiple Locations, Cincinnati, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed