Renovation of a residential development in Norwood, Massachusetts. Completed plans call for the renovation of a residential development.
As of November 22, 2024, projet was awarded to the following Resilent Flooring - Vereika Construction Inc. - $79,500 Painting - Vereika Construction Inc. - $53,000 Plumbing - Rober W. Irvine & Sons, Inc. - 148,480 Electrical Work - M-V Electrical Constractors, Inc. 151,770 with the total amount of $432,750. Electrical, Painting, Plumblng, and Resilient Flooring Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Project consists of but not limited to: Kitchen renovations to 95 apartment units located within (6) 2-story buildings. There are 90 typical standard kitchen layouts and 5 accessible kitchen layouts. Work consists of removal and replacement of existing flooring and wall base with new LVT plank flooring and wall base. Also, the removal and replacement of existing kitchen cabinetry and countertops with new cabinetry and solid surface countertops. The existing ceiling soffits will be modified in order to install new wall cabinetry throughout all 95 units. Existing Refrigerators and Electric ranges will be salvaged and re-used. All other Kitchen appliances will be removed and replaced with new appliances. All existing Kitchen outlets will be converted to GFI protected outlets along with all required Electrical upgrades as indicated on drawings. The work is estimated to cost $1,000,000.00. Resilient Flooring - Massfloors Inc - $70,884.37 Painting - JMS PAINTING CORP - $51,600.00 Plumbing - Robert W. Irvine & Sons, Inc - $148,480.00 Electrical Work - M-V Electrical Contractors, Inc - $151,770.00 MBE (1.6%), WBE (6.9%) A. The Work of the Contract consists of: 1. Kitchen renovations to 95 apartment units located within (6) 2-story buildings. There are 90 typical standard kitchen layouts and 5 accessible kitchen layouts. Work consists of removal and replacement of existing flooring and wall base with new LVT plank flooring and wall base. Also, the removal and replacement of existing kitchen cabinetry and countertops with new cabinetry and solid surface countertops. The existing ceiling soffits will be modified in order to install new wall cabinetry throughout all 95 units. Existing Refrigerators and Electric ranges will be salvaged and re-used. All other Kitchen appliances will be removed and replaced with new appliances. All existing Kitchen outlets will be converted to GFI protected outlets along with all required Electrical upgrades as indicated on drawings. Work either shown on the Drawings or included in the specifications unless specifically indicated not to be done. 2. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 3. Providing and restoring, where appropriate, all temporary facilities. B. Execution of Work: Work to be performed in timely and workmanlike fashion. Site must be cleaned up daily with access needed for overnight. C. Warranties/Guaranties: 1-year installation warranty from the General Contractor on all Work performed. Standard manufacturer material and equipment warranties.
Award
Residential Subdivision
$432,750.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2024
December 30, 2024
10 Brookview Cir, Norwood, MA
Related To This Project
Norwood, MA
Bid Date: Nov 21 2024
Norwood, MA
Bid Date: Jan 15 2025
Norwood, MA
Bid Date: Dec 12 2024
Norwood, MA
Bid Date: Dec 18 2024
Norwood, MA
Bid Date: Dec 18 2024
Norwood, MA
--
Norwood, MA
Bid Date: Feb 20 2025
Norwood, MA
Bid Date: Feb 19 2025
Norwood, MA
Bid Date: Nov 04 2024
Norwood, MA
Bid Date: Oct 24 2024
Norwood, MA
Bid Date: Oct 24 2024
Norwood, MA
Bid Date: Oct 01 2024
Norwood, MA
--
Norwood, MA
Bid Date: Aug 22 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.