BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work for a municipal facility in Norwood, Massachusetts. Completed plans call for site work for a municipal facility.

Estimated Cost $1,400,000. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. PROJECT DESCRIPTION 3.1. Provide the necessary manpower to perform the installation of telecommunication equipment cabling and services to residential and commercial dwellings. All materials will be supplied by The Norwood Light Department, Broadband Division, unless otherwise specified. 3.2. The estimated service drop count is expected to be between two thousand five hundred (2500) and five thousand five hundred (5500) of overhead, MDU and underground construction types. 3.3. Unless otherwise specified by NLB, an optical drop will be installed from a CommScope Hardened Standard Terminal (HST) located at a pole or MDU/UG location to a Network Interface Device (NID) mounted on the exterior of the customer’s premises. The premises will be equipped with an Optical Network Unit (ONU) provided by NLB, installed inside and connected to the NID via fiber. The ONU will connect to a Mesh Wi-Fi device (provided by NLB) or a customer-owned router using a Cat 6 cable. Additional equipment, such as video streaming devices, customer-owned telephones, telephone networks, or other telephone devices (including key systems, PBXs, assisted hearing devices, etc.), will connect through appropriate cabling or connectivity solutions. 3.4. The installer is responsible for ensuring that all Wi-Fi-connected devices within the premises successfully connect to the new Wi-Fi network and that all telephones are operating correctly. Additionally, the installer may assist the customer with the initial setup of video streaming services or ensure the customer can reconnect to previously established video streaming services. 3.5. Installers will also be required to perform other services including, though not limited to the following. 3.5.1.Troubleshoot Service drops from the HST to the CPE. 3.5.2.Troubleshoot WiFi connectivity issues. 3.5.3.Swap CPE Devices 3.5.4.Add CPE Devices 3.5.5.Move existing wiring 3.5.6.Repair or replace existing wiring

Bid Results

Municipal

$1,133,179.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
7
Bidding Soon
2,538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 9, 2025

Project location map

To Be Determined, Norwood, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.