Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 2, 2025 at 8:00 PM
Updated May 3, 2025
Site work for a municipal facility in Norwood, Massachusetts. Completed plans call for site work for a municipal facility.
Estimated Cost $1,400,000. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. PROJECT DESCRIPTION 3.1. Provide the necessary manpower to perform the installation of telecommunication equipment cabling and services to residential and commercial dwellings. All materials will be supplied by The Norwood Light Department, Broadband Division, unless otherwise specified. 3.2. The estimated service drop count is expected to be between two thousand five hundred (2500) and five thousand five hundred (5500) of overhead, MDU and underground construction types. 3.3. Unless otherwise specified by NLB, an optical drop will be installed from a CommScope Hardened Standard Terminal (HST) located at a pole or MDU/UG location to a Network Interface Device (NID) mounted on the exterior of the customer’s premises. The premises will be equipped with an Optical Network Unit (ONU) provided by NLB, installed inside and connected to the NID via fiber. The ONU will connect to a Mesh Wi-Fi device (provided by NLB) or a customer-owned router using a Cat 6 cable. Additional equipment, such as video streaming devices, customer-owned telephones, telephone networks, or other telephone devices (including key systems, PBXs, assisted hearing devices, etc.), will connect through appropriate cabling or connectivity solutions. 3.4. The installer is responsible for ensuring that all Wi-Fi-connected devices within the premises successfully connect to the new Wi-Fi network and that all telephones are operating correctly. Additionally, the installer may assist the customer with the initial setup of video streaming services or ensure the customer can reconnect to previously established video streaming services. 3.5. Installers will also be required to perform other services including, though not limited to the following. 3.5.1.Troubleshoot Service drops from the HST to the CPE. 3.5.2.Troubleshoot WiFi connectivity issues. 3.5.3.Swap CPE Devices 3.5.4.Add CPE Devices 3.5.5.Move existing wiring 3.5.6.Repair or replace existing wiring
Bid Results
Municipal
$1,133,179.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
June 9, 2025
To Be Determined, Norwood, MA
Related To This Project
Norwood, MA
Bid Date: Feb 20 2025
Norwood, MA
Bid Date: Apr 15 2025
Norwood, MA
Bid Date: Mar 27 2025
Norwood, MA
Bid Date: Mar 27 2025
Norwood, MA
Bid Date: Mar 27 2025
Norwood, MA
Bid Date: Mar 27 2025
Norwood, MA
Bid Date: Apr 03 2025
Norwood, MA
Bid Date: Apr 24 2025
Norwood, MA
Bid Date: Feb 19 2025
Norwood, MA
Bid Date: Feb 20 2025
Norwood, MA
--
Norwood, MA
Bid Date: Dec 12 2024
Norwood, MA
Bid Date: Jan 15 2025
Norwood, MA
Bid Date: Nov 21 2024
Norwood, MA
Bid Date: Oct 29 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
