BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Savannah, Georgia. Conceptual plans call for site work for a water / sewer project.

This is not a solicitation. This posting is a Sources Sought Notice only. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors who can perform Mowing/Cutting in areas that include Disposal Areas, Bird Island Clearing and Herbicide treatment in Chatham and Glynn Counties, Georgia and Jasper County, South Carolina. There are nine (9) locations for Savannah Harbor in Chatham County,, Georgia and Jasper County, South Carolina as well as two (2) locations near Brunswick Harbor in Glynn County, Georgia. This request does not obligate the Government in any way to post a Request for Quote or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. The applicable NAICS code is 561730 - Landscaping Services with a size standard of $9,500,000.00. The potential magnitude for this requirement is estimated between $2,500,000.00 to $5,000,000.00. Work may include by not limited to the following: This work consists of mowing the Savannah and Brunswick Harbor Dredge Material Containment Areas (DMCA)s of earthen dikes and cross dikes. The combined acreage to mow for Savannah Harbor DMCAs will be approximately 800 acres and will be required four times a year. The combined acreage to mow for Brunswick Harbor DMCAs will be approximately 72 acres and required '3' times a year. The exterior of the dikes rises in steps, from the tidal marsh to various elevations. The typical dike cross section includes 1 to 3 steps, having sides with variable slopes ranging from 1 vertical to 2 horizontal (1V:2H) to 1V:3H and benches of varying widths. The ground conditions of the dikes, slopes, and benches vary from firm to soft. It is anticipated that areas along the lower bench will be wet and soft which cannot support typical mowing equipment. Mowing is to be accomplished using appropriate equipment that will prevent damage and rutting to the dikes. Contractor shall furnish all plant, labor, equipment, special equipment, and material to fulfill the requirement of this contract. Mowing/Cutting shall consist of cutting the vegetation along the dikes, dike slopes, counterweights, access ramps, underdrain stations, underdrain station ramps, weir access ramps, and weir outfalls of eight Dredge Material Containment Areas (DMCA)s in Savannah Harbor. In addition to the dikes, mow/cut the access roads of the DMCAs, and a staging area in Savannah Harbor. The contractor shall herbicide the weir areas as directed by the Government in proximity of weir walkways, and weir outfalls of DMCAs and an underdrain station. The contractor shall remove vegetation and herbicide the interior bird nesting islands located in five DMCAs, as well as an approximately 5-acre bird island approximately 2 miles offshore in Savannah Harbor. In addition, this contract will include full mowing/cutting of vegetation and herbicide application of approximately 72 acres of a DMCA on Andrew's Island in Brunswick Harbor, and herbicide application and clearing of an in-shore bird island of approximately 15 acres in Saint Simons Sound. Please submit a capabilities statement and the Sources Sought Questions document filled out in its entirety and return via email to the Points of Contact provided in this announcement. The capabililties statement should address the particulars of this effort,, with appropriate documentation supporting claims of organizational, staff, and equipment capability. Please state if you have experience in performning mowing/cutting in areas that include mechnical clearing and herbicide treatment. If significant subcontracting (self-performance is less than 15%) or teaming is anticipated in order to deliver technical capability organizations should address the administrative and management structure of such arrangements to include the percentage anticipated to be self-performed by each party. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
32
Bidding Soon
520
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

img_map_placeholder

Multiple Locations, Savannah, GA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.