Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; water / sewer project; and road / highway.
The proposed work includes: The addition of a 2-way, street level, physically protected bike and scooter facility on the existing asphalt pavement along the west side of Tucker Boulevard between Washington Avenue and Chouteau Avenue. The project will also include elements that improve pedestrian safety and accessibility such as updated pedestrian signal heads, high visibility crosswalk markings, a mid-block median crosswalk refuge island at City Hall, and updated ADA curb ramps at select locations along the west side of Tucker. In addition, a new traffic signal is planned to replace the existing signal at the intersection of Tucker and Chouteau. This new signal will accommodate the cycle track, lane reconfiguration, curb ramps, and modified drainage at this intersection. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2022 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The Board of Public Service reserves the right to reject any or all bids. The DBE Goal for this project is 8%. No 2nd tier subcontracting will be allowed on this project. MODOT - Tucker Boulevard Cycle Track All questions concerning the bid document preparation can be directed to: Ms. Helen Bryant City of St. Louis, Department of the President Board of Public Service Room 301 City Hall 1200 Market Street St. Louis, Missouri 63103 Telephone: 314-589-6214 Bid Inquiries and Substitution Requests: no later than 11/5/2024 at 5:00 PM
Bid Results
Sidewalks / Parking Lot
$1,689,550.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2024
March 3, 2025
Tucker Blvd, Saint Louis, MO
Related To This Project
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Nov 15 2024
Saint Louis, MO
Bid Date: Oct 22 2024
Saint Louis, MO
Bid Date: Nov 20 2024
Saint Louis, MO
Bid Date: Nov 20 2024
Saint Louis, MO
Bid Date: Nov 11 2024
Saint Louis, MO
Bid Date: Nov 19 2024
Saint Louis, MO
Bid Date: Nov 04 2024
Saint Louis, MO
Bid Date: Nov 07 2024
Saint Louis, MO
Bid Date: Oct 31 2024
Saint Louis, MO
Bid Date: Oct 31 2024
Saint Louis, MO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.