BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Tustin, California. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Construction Management Firm (CM) shall provide all the services discussed in this section. The consulting services to be provided will include the following general items of work separated into two major tasks; Pre-construction Services (Section A) and Construction Services (Section B) The current engineer's estimate for construction of the project is approximately $18.4 million (Legacy Park Ph. 3 (CIP 20083) - $13M, N-D South Phase 2 Package 2 (CIP 70256) - $1.4M, Armstrong Ped Bridge (CIP 70257) - $4M.) The project will consist of a Ped Bridge spanning over and across Armstrong Ave, Legacy Park Ph. 3, and N-D South Phase 2 Package 2. The project is located in Tustin Legacy, in the area generally bound by and adjacent to Warner Ave, Compass Ave, Airship Ave and Armstrong Ave. The said construction project includes (but not limited to) a public park along with its amenities, a pedestrian bridge spanning over and across Armstrong Ave, cap paving of John Johnson Ave and Veterans Way, signing & striping along John Johnson Ave and Veterans Way, street lighting along John Johnson Ave and Veterans Way, dry utilities, traffic signal and intersection improvements at Warner Ave and Veterans Way. Question Submission Deadline: November 5, 2024, 5:00pm It is expected that the contract bid advertisement process for the construction will begin in April 2025 with the construction anticipated to start in June/July 2025. The entire construction period is estimated at 15 months.

GC Bidding

Bridges / Tunnels

$18,400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
2,412
All Active Projects
1,076
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

February 12, 2025

img_map_placeholder

Multiple Locations, Tustin, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.