BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Richmond, Virginia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; and playground / park / athletic field.

Request for Interpretations Due: October 28, 2024, 4:00pm 1. STATEMENT OF WORK 1.1. Purpose The City of Richmond is accepting bids for general contracting services for the Crooked Branch Ravine Park 42nd Street Bridge project which includes, but is not limited to, pavement demolition, site grading, erosion and sediment control, concrete abutment construction, coordination of delivery and erection of prefabricated bridge elements, trail overlay, tree removal, tree protection, and associated efforts as described in the provided plans. The Crooked Branch Ravine Park 42nd Street Bridge project was developed to provide a shared-use connection from Crutchfield Street to the terminus at 42nd Street. 1.2. Statement of Work 1.2.1. General Information The Crooked Branch Ravine Park 42nd Street Bridge project has been divided into multiple phases. The scope of work for this phase (Phase 1) is focused on the installation of a prefabricated bridge and associated general contracting services stated in Section 1.1 Purpose described in the attached plans. 1.2.2. Park Access Crooked Branch Ravine Park can be accessed from an entrance along Crutchfield Street at the approximate address of 4001 Crutchfield Street. Additional access and laydown area at the terminus of 42nd street is noted in the attached plans. 1.2.3. Access to Bridge Site from Crutchfield Street The attached trail plans serve as the preferred route for construction access to the bridge site at Reedy Creek from the South. Parks, Recreation, and Community Facilities staff may consider other route options in consultation with the Contractor, relevant stakeholders, and experts. 1.2.4. Access to Bridge Site from 42nd Street The attached plans show the access at the terminus of 42nd Street; the prefabricated bridge will likely need to come in via 42nd Street. Parks, Recreation, and Community Facilities staff may consider other route options in consultation with the Contractor, relevant stakeholders, and experts. 1.2.5. Add Alternates Add alternates for pier and solid foundation ramps up the bridge from both the North and South sides will be accepted. Add alternates for gavel and/or asphalt trail construction will also be accepted. 1.2.6. Tree Preservation and Protection All viable efforts to protect existing trees should be incorporated into the construction approach with preference given to mature native and specimen species. Methods of construction that add material above root protection zones and limit excavation below grade/root level are preferred. ISA best management practices are preferred. Parks, Recreation and Community Facilities staff and city arborists are available for consultation for tree protection practices throughout the duration project. See attached tree inventory for reference. 1.2.7. USACE Permitting United States Army Corps Engineers Permitting is currently underway. A notice to proceed will be issued after all USACE permits are in hand. Contractor shall abide by all regulations stipulated by USACE. 1.3. Prequalification This project has not been prequalified under the Code of the City of Richmond, Section 21-46. All interested bidders are encouraged to participate. 1.4. American Rescue Plan Act (ARPA) Funds Funds used by the City to make payments under the Contract may be derived in whole or in part from the City's allocation of Coronavirus State and Local Fiscal Recovery Funds established under the American Rescue Plan Act of 2021 ("ARPA"). Accordingly, the provisions set forth in section 3.3 ("American Rescue Plan Act (ARPA) Provisions") of Part 3 ("Special Conditions of the Contract") of this IFB No. IFB No. 250004517 apply. 1.2. Statement of Work 1.2.1. General Information The Crooked Branch Ravine Park 42nd Street Bridge project has been divided into multiple phases. The scope of work for this phase (Phase 1) is focused on the installation of a prefabricated bridge and associated general contracting services stated in Section 1.1 Purpose described in the attached plans. 1.2.2. Park Access Crooked Branch Ravine Park can be accessed from an entrance along Crutchfield Street at the approximate address of 4001 Crutchfield Street. Additional access and laydown area at the terminus of 42nd street is noted in the attached plans. 1.2.3. Access to Bridge Site from Crutchfield Street The attached trail plans serve as the preferred route for construction access to the bridge site at Reedy Creek from the South. Parks, Recreation, and Community Facilities staff may consider other route options in consultation with the Contractor, relevant stakeholders, and experts. 1.2.4. Access to Bridge Site from 42nd Street The attached plans show the access at the terminus of 42nd Street; the prefabricated bridge will likely need to come in via 42nd Street. Parks, Recreation, and Community Facilities staff may consider other route options in consultation with the Contractor, relevant stakeholders, and experts. 1.2.5. Add Alternates Add alternates for pier and solid foundation ramps up the bridge from both the North and South sides will be accepted. Add alternates for gavel and/or asphalt trail construction will also be accepted. 1.2.6. Tree Preservation and Protection All viable efforts to protect existing trees should be incorporated into the construction approach with preference given to mature native and specimen species. Methods of construction that add material above root protection zones and limit excavation below grade/root level are preferred. ISA best management practices are preferred. Parks, Recreation and Community Facilities staff and city arborists are available for consultation for tree protection practices throughout the duration project. See attached tree inventory for reference. 1.2.7. USACE Permitting United States Army Corps Engineers Permitting is currently underway. A notice to proceed will be issued after all USACE permits are in hand. Contractor shall abide by all regulations stipulated by USACE.

GC Bidding

Playgrounds / Parks / Athletic Fields

$850,000.00

Public - City

Paving, Site Work

17

6

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
54
Bidding Soon
831
All Active Projects
310
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

December 9, 2024

img_map_placeholder

Northrop St, Richmond, VA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.