BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Savannah, Georgia. Completed plans call for site work for a water / sewer project.

The purpose of these specifications is to describe requirements sludge dredging of two sludge ponds. Georgetown Water Reclamation Plant -14 Beaver Run Drive and Wilshire Water Reclamation Plant -11015 Largo Drive Q And A Close10/30/2024 9:30:00 PM The contract time for this work is 180 calendar days, including fifteen (15) adverse weather days. Liquidated damages at a rate of $200.00 per calendar day will be assessed for every day that exceeds 180 days. To submit pricing electronically for this event, enter pricing for each line item shown under the lines tab on the event summary. Large files may need to be split up and uploaded as multiple attachments. A pre-bid conference has been scheduled to be conducted, followed by an on-site visit at each of the facilities. This conference will allow contractors to discuss the specifications and resolve any questions and/or misunderstandings that may arise. The site visit will allow contractors to review and inspect the worksite. You are invited to attend The Contractor shall furnish all materials and perform all work as described in this section. 4.1.1 Georgetown Water Reclamation Plant Background Information There is roughly an estimated 8233.57 cubic yards of wet sludge. This calculated estimate was based on the information and physical measurements taken around the pond. The as-built drawings for the pond at the Georgetown Water Reclamation Plant can be found in Attachment 1. 4.1.2 Wilshire Water Reclamation Plant Background Information There is roughly an estimate 18902.37 cubic yards of wet sludge in pond 1 located at the Wilshire Water Reclamation Plant Pond. This estimate was calculated by information and physical measurements. The as-built drawings for the pond at the Wilshire Water Reclamation Plant can be found in Attachment 2 and Attachment 3. (For more information, please refer to the attachment BH-20348-TTBH.) The City of Savannah has established an 20% DBE goal for this project of which at least 10% must be met by a Local DBE.

Post-Bid

Water / Sewer

$900,000.00

Public - City

Site Work

3

7

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
23
Bidding Soon
501
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

Multiple Locations, Savannah, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.