Site work for a pipeline in Stilwell, Oklahoma. Completed plans call for site work for a pipeline.

Document info: Additional copies of the Project Manual, including Specifications, plus on set of print Drawings, may be obtained upon payment of $25 per set, nonrefundable. No partial sets will be issued. Northeast Oklahoma Public Facilities Authority (NOPFA) will accept separate sealed bids for Construction Labor to bids for Construction Labor to include installation of trench installed steel and MDPE pipe as well as Horizontal Directional Drilling and Steel Pipe Casing installation for the relocation of a Natural Gas Main Pipeline, north of Stilwell, Adair County, OK, according to the Drawing and Specifications prepared by Small Arrow Engineering, LLC . This project is associated with Oklahoma Department of Transportation Project Number 30570 (04). Construction Labor for Replacement Natural Gas Pipeline along US Highway 59 north of Stillwell, Adair County, OK The Owner reserves the right to reject any or all bids and to waiver irregularity in the bids and in the bidding. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. Also, all bidders must furnish the properly executed "Non-Collusion Certificate" contained with the bid documents. In addition, this project is subject to Davis-Bacon requirements for prevailing wages and Buy America requirements for supply of materials. Bid Bond: Five (5%) of Bid Amount No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. NOPFA hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement. Disadvantaged Business Enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The Owner (NOPFA) will provide the following natural gas pipeline materials for all Phases of the Project: 1. Steel coated line pipe, associated elbows, tees, couplings, caps. 2. Steel gas ball valves and valve boxes with extensions. 3. Hot tap weld tee 3-Way Spherical CL 300 fittings with completion plugs and covers, purge and equalization fittings. 4. Steel road crossing casing pipe and vent pipe. 5. MDPE line pipe, associated elbows, tees, tapping tees, couplings, caps. 6. MDPE gas ball valves and valve boxes with extensions. 7. Steel pipe to MDPE pipe transitions fittings. 8. High and low pressure regulators. 9. Pressure relief valves. 10. Gas meters. 11. Pipe and pipe fitting coating and wrapping materials. 12. Gas pipeline locator placards and/or signs.

Post-Bid

Pipeline

$2,400,000.00

Public - City

Site Work

27

13

36

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
109
Bidding Soon
1,178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

January 13, 2025

Project location map

US-59, Stilwell, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.