BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Detroit, Oregon. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Background: The BCLH Stewardship IRSC Phase 3 shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Stewardship authority grants the Forest Service the authority to aggregate stewardship work activity requirements and solicit those requirements utilizing full and open competition. This notice is issued for informational purposes only and to provide an opportunity for fall viewing of the project site prior to issuance of the solicitation. The government also wants to generate interest in the project and values early feedback from industry regarding the requirement. The final contract requirements are still being developed and therefore, the information provided is subject to change. Offers should not be developed based on the draft information provided in this notice. Project Location: The BCLH Stewardship IRSC Phase 3 project is located approximately 1 to 5 miles west of Detroit, OR within the burn scars of the Beachie Creek Fire and Lionshead Fire, both of which occurred in 2020. The total project area is 1,843 acres in size and is located on the Detroit Ranger District of the Willamette National Forest. Access to the project is via FSR 46. The ground to be treated is within Sec 23-28, 32-34 & 36, T08S, R04E; Sec 31, T08S, R05E; Sec 2-5, & 11, T09S, R04E; Sec 6-8, 13-17, 20-26, 28, 35, & 36, T09S, R05E; Sec 19-29, T09S, R06E; Willamette Meridian, Surveyed & Unsurveyed, Marion and Lane County, Oregon. Draft Vicinity Maps which include Phase 3 as well as Phases 1 and 2 pre-solicited separately have been provided as an attachment to this notice. All the roads to be treated via this contract are detailed on the maps. Period of Performance: The tentative date for completion of all Mandatory work is October 15, 2027. Optional work shall be completed by October 15, 2028. Fish logs must be delivered by May 1, 2026. The anticipated operational seasons for road work activities is the dry season from approximately May 15 - October 15 annually. Ground based hazard tree work is anticipated to be permitted year-round and must comply with required protections for wet season operations and IFPL. Description of Work: The objectives of this project are to reduce the risks of hazardous fuels that have fallen across or remain standing along important access routes within the 2020 fire-affected road system so that access to and through the burned area can be restored. Activities include performing mitigation of risk along roads from fire killed/damaged trees, reduction of roadside fuel accumulation and essential maintenance and reconstruction of roads. The following work activities shall be required. The work shall be broken out as Mandatory and Optional work in the solicitation. Cut and remove fire killed trees within 100 feet of roads (approximately 190 acres designated as Mandatory and 227 acres Optional). Hazard trees to be cut are Designated by Prescription. Fall and leave non-commercial hazard trees within Special Measure Areas (SMAs). SMAs may include Riparian Reserves, cultural resource areas, wildlife habitat protection areas or other areas that requires special protections. This work is located within 100 feet of the road. SMAs do not overlap acres that require the cutting and removal of fire killed trees. Approximately 454 acres are designated as Mandatory and 154 acres Optional. Within unit polygons, fall and leave hazard trees that can strike the road outside of the 100-foot fuels removal area (approximately 30 acres designated as Mandatory and 11 acres Optional). Perform small fuels treatment within 30 feet of roads (approximately 272 acres designated as Mandatory and 150 acres Optional). Fuel to be treated includes existing downed or cut trees less than 16-inch DBH that do not meet the fuel loading standard. Material can be removed using a variety of methods. Piling of fuels for burning is not allowed. Perform road reconstruction during the dry season (May 15-October 15). Mandatory construction work includes road reconditioning (46 miles), 46 culvert replacements with sizes that vary from 24 to 60-inch culvert, approximately 3,900 SF of reinforced soil slope, and placement of approximately 16,500 CY of sub-base and 11,000 CY surface course aggregate. Forest Service roads: 2207000, 2209000, 2209201, 2223000, 2225000 are planned for treatment. The Government's estimate for the Mandatory reconstruction work is between $1,000,000 and $5,000,000. Optional construction work includes road reconditioning (31 miles), 24 culvert replacements with sizes that vary from 24 to 48-inch culvert and placement of approximately 17,000 CY of subbase and 11,000 CY of surface course aggregate. Forest Service roads: 2207214, 2223520, 2225450, 2225458, 2225461, 4695000, 4695110, 4695120, 4695130, 4695132, 4695133, 4696701 are planned for treatment. The Government's estimate for the Optional reconstruction work is between $1,000,000 and $5,000,000. **Placement of aggregate as approved by a qualified engineering COR is necessary for conditional road use during the wet weather season (October 16-May 14). Subbase would be placed prior to operations and surface course after work is completed. All aggregate shall be furnished by the government and is located in the McCoy Pit (44.69266N, 122.03350W on 2233-605). Perform pre-haul, during-haul and post-haul road maintenance within the Contract Area (approximately 50 miles Mandatory - Forest Service roads: 2207000, 2209000, 2209201, 2223000, 2225000 and 31 miles Optional - Forest Service roads: 2223520, 2225450, 2225458, 2225461, 4695000, 4695110, 4695120, 4695130, 4695132, 4695133, 4696701). General T-specifications applicable to the work: blading, surfacing, maintenance for high clearance vehicle use, cutting roadway vegetation and water supply/watering. Yard and deliver non-commercial fish logs to 3 deck locations. 525 logs (greater than 8-inch DBH) and up to 350 cubic yards of slash (woody debris less than 8-inch DBH) shall be delivered by May 1, 2026. Fall and leave individual hazard trees that are outside of units but within striking distance of the road (not-to-exceed 1500 individual trees). Designated trees adjacent to the listed units that fall outside the unit polygon but are still tall enough to fall and strike the road (adjusted for slope), shall be felled. Trees felled into the 100-foot removal area must be left on site and will count towards the downed wood requirement. Trees to be felled must be pre-approved by a COR prior to cutting. Contractors will track individual trees that are felled with a log of GPS points and date of COR approval. This is an Optional work item. Equipment required for tree cutting will operate from within the road prism if slopes exceed 30%. Equipment may be utilized off the road prism on slopes <30% during the normal operating season (May 15th to October 15th) using slash mats. Equipment may also be allowed to operate on frozen soils/packed snow with approval from the Forest Service. See table below for estimated treatment acres by slope generated from LiDAR data. Shape files will be provided as an attachment to the solicitation. Phase 3 Slope Data >30% Mandatory Acres:397, Optional Acres: 264 <30% Mandatory Acres: 197, Optional Acres: 116 Fire severity varied across the treatment areas; burn severity maps and tables shall be provided with the solicitation for planning purposes. Below is a summary of treatment acre condition. Phase 3 Burn Severity Low Basal Area Mortality (0-25%) Mandatory Acres: 26 Optional Acres: 81 Moderate Basal Area Mortality (26-50%) Mandatory Acres: 107 Optional Acres: 69 High Basal Area Mortality (>50%) Mandatory Acres: 511 Optional Acres: 231 Estimated Timber Volume and Species composition is as follows: Forest product volume estimates for the cut and removal of fire killed trees is provided below. Volume quantities are made available with the understanding that values shown are Forest Service estimates and are not guaranteed. Interested Contractors are urged to examine the individual contract areas and make their own estimates. Approved LIDAR and RAV data has been used to determine volume on the BCLH Stewardship IRSC Phase 3. Mandatory Acres - Cut and Remove Fire Killed Timber within 100' of the road: 190 acres - 16,850 volume (TONS) Optional Acres - Cut and Remove Fire Killed Timber within 100' of the road: 227 acres - 23,622 volume (TONS) Pre-Solicitation Site Visit Date and Time: Prior to solicitation, the Forest will hold a site visit for prospective contractors to facilitate dialogue on contractual requirements that are anticipated in the contract and any operational limitations foreseen by attendees. The site visit will be held on Tuesday, November 5, 2024, at 1:00 p.m. PT with the initial meeting location at Detroit Ranger Station, 44125 North Santiam Highway SE, Detroit, OR 97342. Contractors shall email Karen Ruklic by noon on Friday, November 1, 2024, if they are planning to attend the meeting. Since the solicitation will be issued while the project area is inaccessible due to snow, it is critical that interested vendors attend the site visit. Vendors that wish to view the site independently will need an approved Road Use Permit. Review the Project Area Access Instructions provided as an attachment. Email Heidi Andersen (heidi.andersen@usda.gov), Brett Blundon (brett.blundon@usda.gov) and Darrin Neff (darrin.neff@usda.gov) at least 2 business days prior to visiting to complete the required paperwork and receive approval to access the roads and receive gate codes and/or key. Draft Documents: The following draft documents shall be supplied prior to the site visit: Schedule of Items Appendix A - Technical Specifications for Service Work Items Appendix B - Timber Removal Specifications Scaled Appendix C - Road Maintenance Specifications Draft Construction Tables, Worklists and Typicals Draft Maps and Tables (TBD). Final Solicitation Issuance: It is anticipated that the Request for Proposals with all attachments shall be issued on or around March 31, 2025 with award planned for approximately June 6, 2025. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price contract. Service Contract Act and Construction (Davis Bacon) Wage Determinations will be provided when the contract IRSC is solicited. Construction Bonding: A bid bond or other acceptable bid guarantee valued at 20% of the construction total price offered (all Mandatory and Optional Items combined) shall be required and submitted with the initial offer. Bonding shall be required in connection to the value of the awarded construction work only. Payment and Performance bonds valued at 100% of the total construction price shall be required from the contract awardee. Point of contacts: Karen Ruklic, Contracting Officer, with the National Stewardship Contracting Branch at karen.ruklic@usda.gov, 208-702-3519 and Heidi Andersen, Disaster Recovery Project Manager, heidi.andersen@usda.gov, for questions regarding the solicitation. Follow this notice on sam.gov for future notifications. This notice was originally posted under Solicitation Number 12383N25R4003 by mistake. The month for site visit was also corrected from October to November.

Final Planning

Roads / Highways

$5,000,000.00

Public - Federal

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
30
Bidding Soon
559
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

img_map_placeholder

44125 N Santiam Hwy, Detroit, OR

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.