BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Demolition, site work and asbestos abatement for a mixed-use development in Milton, West Virginia. Design plans call for the demolition of a 3,150-square-foot municipal facility; for site work for a municipal facility; water / sewer project; and for asbestos abatement for a municipal facility.

As of August 26, 2025, this project is on hold while waiting on the owner to proceed. The general contractor has not been identified. A firm construction timeline has not been established. * Sealed demo bids are invited for: 1174 South Main St. Milton, WV 25541 Scope: 1174 South Main Street: the structure is approximately 3150 Sq Ft wood framed brick veneer. There is also an accessory structure to be demolished located behind the main structure. Includes demolition of structures and block foundations, debris removal, stubbing sewer and water, and spreading straw. The work must commence within ten (10) days after Notice to Proceed. Completion is required thirty (30) days from start of demo. Asbestos abatement is required. All bids must be submitted by a licensed contractor according to WV Code 30-42-2. For just cause, the City of Milton reserves the right to reject any and all bids, and to waive informalities.

Design

Municipal

$60,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
46
Bidding Soon
825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

November 25, 2025

Project location map

1174 S Main St, Milton, WV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.