EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2024 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in Dover, Ohio. Completed plans call for the construction of a power facility; for site work for a power facility; and water / sewer project.

The Furnishing of Labor and Materials for the Construction of New Pump House No. 4 at the Dover Power Plant for the City of Dover, Ohio; All bids shall comply with the requirements of such specifications. Each bid shall be accompanied by a bid guaranty in the form of 1) a certified check, or cashier's check, or letter of credit, equal to 10% of the bid; or 2) a bid guaranty bond for the full amount of the bid; both forms of guaranty as provided in Chapter 153 of the Ohio Revised Code and in the project specifications. The amount of the bid for said guaranty purposes shall include all additive and deductive alternates. All bid guaranties shall be conditioned that if the bid is accepted within sixty (60) days of the bid opening, a proper contract shall be executed, and that upon failure or refusal to enter into said contract within ten (10) days after receipt of notification of award the bidder and the surety on any bond shall be liable to the City in an amount not to exceed ten (10) per cent of the bid. Each bidder must insure that all employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin. *The right is reserved to reject any or all bids. Bid results - General contractor work bid - Gor Con Construction - $ 147,187 Mechanical work bid - Gor Con Construction - $ 125,190 Electrical work bid - Gor Con Construction - $ 102,330

Bid Results

Water / Sewer

$374,707.00

Public - City

New Construction, Site Work

6

7

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting, Emergency Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
116
Bidding Soon
1,382
All Active Projects
662
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Construction of New Pump House No. 4 at the Dover Power Plant

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.