Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in San Jose, California. Completed plans call for site work for a water / sewer project.
The Project scope of work includes upgrades and enhancements to the perimeter fencing and vehicular and pedestrian gate access at five Valley Water sites, including: Site 1: Coyote Pumping Plant, 1833 Peet Road, Morgan Hill, CA Replace 1,728 linear feet (LF) of existing 6-foot to 7-foot-high fencing with 9-foot high mini-mesh chain-link fence; replace one existing pedestrian gate; replace two existing 20-foot-long manual vehicular gates; and replace one 25-foot-long automatic vehicular security gate. Site 2: Santa Teresa Water Treatment Plant, 7011 Graystone Lane, San Jose, CA Replace 2,725 linear feet (LF) of existing 6-foot to 8-foot-high fencing with 9-foot high mini-mesh chain-link fence; install 880 linear feet (LF) of new fencing along other segments of Valley Water's property line to include new fencing around the clear well; replace seven existing pedestrian gates; replace two existing 18-foot- long manual vehicular gates; and replace two 29-foot-long automatic vehicular security gates. Site 3: Winfield Complex, 5905 Winfield Blvd, San Jose, CA Replace 1,003 linear feet (LF) of existing 6-foot to 9-foot high fencing with 9-foot high mini-mesh chain-link fence; install 200 linear feet (LF) of new fencing along other segments of the Valley Water's property to extend the Gate A entrance and Gate B exit; replace one existing pedestrian gate; replace one existing 30-foot long manual vehicular gate; and replace one existing 28-foot long and one 30- foot long manual vehicular gates with new automatic vehicular security gate. Site 4: Headquarters, Corporate Yard, 5770 Almaden Expressway, San Jose, CA Replace 1,546 linear feet (LF) of existing 6-foot to 8-foot high fencing with 9-foot high mini-mesh chain-link fence; install 300 linear feet (LF) of new fencing along other segments of the Valley Water's property; replace two and install one new pedestrian gate; remove two 20-foot long and one 40-foot long manual vehicular gates and replace with 9-foot fencing; replace one 10-foot long manual vehicular gates; and replace three 20-foot long new automatic vehicular security gates with Site 5: Silicon Valley Advanced Water Purification Center, San Jose, CA new automatic vehicular security gates. Replace 1,929 linear feet (LF) of existing 6-foot to 8-foot-high fencing with 9-foot high mini-mesh chain-link fence; replace two existing and install one new pedestrian gate for Visitor Center relocation; replace two12-foot and one 24-foot manual vehicular gates; and replace one 40-foot and one 50-foot automatic vehicular security gates. Online Q&A Yes Q&A Deadline 11/11/2024 5:00 PM (PDT) License Requirements Class A Project Duration 320 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $3M - $4M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. No questions will be entertained during this conference. Please submit written questions to the Q & A Tab of the Project Solicitation VW0507 at PlanetBids. The deadline to submit questions is November 11, 2024, by 5:00 p.m.
Post-Bid
Water / Sewer
$4,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2024
January 20, 2025
Multiple Locations, San Jose, CA
Related To This Project
San Jose, CA
Bid Date: Nov 13 2024
San Jose, CA
Bid Date: Nov 14 2024
San Jose, CA
Bid Date: Oct 29 2024
San Jose, CA
Bid Date: Nov 22 2024
San Jose, CA
Bid Date: Nov 21 2024
San Jose, CA
Bid Date: Nov 07 2024
San Jose, CA
Bid Date: Nov 20 2024
San Jose, CA
Bid Date: Nov 21 2024
San Jose, CA
Bid Date: Nov 21 2024
San Jose, CA
Bid Date: Dec 05 2024
San Jose, CA
Bid Date: Nov 07 2024
San Jose, CA
Bid Date: Nov 07 2024
San Jose, CA
Bid Date: Nov 05 2024
San Jose, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.