BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a stadium in Lincoln, Nebraska. Completed plans call for site work for a stadium.

Automatic Fence for Pinnacle Bank Arena Question Deadline 11/01/2024 at 2:00 PM CT All inquiries regarding these specifications shall be submitted in writing to Sharon Mulder, Asst. Purchasing Agent via email to (smulder@lincoln.ne.gov) The City of Lincoln, hereinafter referred to as Owners, are requesting bids from qualified companies, hereinafter referred to as Vendor(s); the new automatic gate for loading dock for Pinnacle Bank Arena requires the following: 1.1.1 Installation of 2 automatic gate operators on each side of gate #2. 1.1.2 Installation of all new power and concrete work if required. 1.1.3 Install all required magnetic gate locks. 1.1.4 Delivery and Installation must be included PROJECT SCOPE 2.1 Install 2-ea automatic gate operators on existing slide gates at Gate #2. Each operator will be mounted per recommendation of fence bidder. Attach each operator to existing gates with chain brackets and new roller chain. Install safety photo eye across drive and one safety edge on the end of each gate. Replace existing bottom gate rollers with new rollers with covers. If needed straighten fence line on east gate so the gate does not hit existing fence line. Install gate extension where applicable. Mount and install 1-ea gate control to be used to open the gate by security/facility personnel. Install 2-ea gate strikes on walk gates on the east and west side of Gate #2 area. Once the electrical is complete programing and calibration of operator will be complete. Provide any other access controls depending on recommendation of bidder. 3. INSTALLATION OF EQUIPMENT 3.1 Equipment needed to make Gate 2 operable must be all new and must be included in the bid: 3.1.1 Cut concrete where needed per recommendation of fence bidder 3.1.2 Break and remove concrete where needed 3.1.3 Trench new at least 2" conduit from main panel outside 3.1.4 Backfill and tamp back dirt 3.1.5 Install a new steel rack where needed 3.1.6 Install a new 200A 3ph outdoor rated panel on rack on east gate. 3.1.7 Install (1) additional 30amp & 50amp on west side of gate and 50amp on east side of gate #2 for additional use for existing guard shack. 3.1.8 50amp receptacle should be 125/250V AC (California 50amp) 3.1.9 Connect the conduit to the new panel and wire for this panel 3.1.10 Provide any necessary breakers and connect wire to new panel 3.1.11 Install and pins in the concrete trench 3.1.12 Pour back concrete in trench area 3.1.13 Bidder is responsible to add any additional work parts where necessary to make a full functional gate system. 3.1.14 Provide and install new breakers in the panel and connect to the gate operator wiring 3.1.15 Install new point to point device on the post and on the building 3.1.16 Bidder to provide new extended post on the fence for Data point to point device 3.1.17 Connect the post side to the gate operator and provide path on building side for their IT to connect to 3.1.18 Test operation 3.1.19 3.2 Install Power to Magnetic Gate Locks: 3.2.1 Find the closest 120v power supply to the lock location 3.2.2 East gate will need to be flipped so locking plate is on the building side

Post-Bid

Arenas / Stadiums

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
465
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2024

December 6, 2024

img_map_placeholder

400 Pinnacle Arena Dr, Lincoln, NE


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.