BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2024 at 7:00 PM

Updated November 22, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Thornton, Colorado. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project will replace the existing culverts at Pecos Street for the Niver Creek Tributary M with a new increased capacity crossing. The existing culverts are severely rusted and at risk of failing. The capacity of the existing culverts is also causing flooding damage upstream. Mile High Flood District (MHFD) will be managing this project with Federal Heights as the requesting municipality and with Thornton participation. Federal Heights will be applying for a grant to fund this project. The 2024 and 2025 funding will be Thornton's portion of the local match for the project design and construction. As of November 21, 2024, this project is included in the city's 2024-2028 Capital Improvement Program (CIP). Construction is expected to begin towards the end of 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$350,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
0
Bidding Soon
846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

Project location map

N Pecos St, Thornton, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.