BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 12, 2025

Site work and paving for a sidewalk / parking lot in Thornton, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of February 11, 2025 project was awarded to Sunland Asphalt Co. but awarded amount is not available.** Provide construction services for Mountain Range High School and Horizon High School per construction documents. Contractor and subcontractors shall work collaboratively with the district, Designer, and other key stakeholders to plan the work so as to minimize disruptions to the facility including tenant and assembly spaces. Window for construction work is June 2, 2025 through August 15, 2025. Adams 12 Five Star Schools contracted with R&R Engineers-Surveyors, Inc. for design, construction documents and construction administration. See Project Manual dated December 5, 2024 and Construction Drawings dated December 5, 2024. These documents are included in the RFP. Reference Number 0000370208 Job Location: Mtn Range High School/Horizon High School, Thornton, CO This RFP is for pavement renovations at 2 high schools in Thornton, CO Question Deadline 01/03/2025 at 10:00 AM MT Questions are submitted online No, Submit All Questions via email to brenda.mcgee@adams12.org Written questions received before the deadline and concerning this solicitation's documents will be answered in addenda to this solicitation and will formally provide all the submitted questions with responses. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Employee Background Checks Required - FOB Destination - Installation Required - Insurance Required - License Required - Local Service Required - Material Safety Data Sheets Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Bid Bond - is required for this project. The proposal must be accompanied by a Bid Bond in the form of a certified check, bank money order, cashier's check, or bid bond acceptable to the Owner in a sum equal to at least 5% of the base bid, payable without condition to Adams 12 Five Star Schools. Mandatory Pre-Proposal Conference and Site Walk: A representative of the Offeror must attend these mandatory conferences in its entirety in order to qualify to submit an offer to this solicitation. Offerors who fail to arrive and sign the attendance record at the pre-proposal conference within five (5) minutes of the scheduled starting time shall be considered nonresponsive and ineligible for award. Anyone wishing to attend the pre-bid conference must have a valid government-issued photo ID.

Award

Sidewalks / Parking Lot

$200,000.00

Public - County

Paving, Site Work

83

5

11

6

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
63
Bidding Soon
1,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

May 30, 2025

Project location map

Multiple Locations, Thornton, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.