BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of an educational facility in Thornton, Colorado. Completed plans call for the construction of a 243,000-square-foot educational facility; and for site work for a educational facility.

As of May 14, 2026, a construction manager has been selected. Sub-bidding is underway, with pricing due on the 5th, of June 2026. Subcontractors and bidders must be prequalified with the construction manager to obtain documents and bid. A firm construction timeline has not yet been determined. *The closed solicitation has been included below for reference: Reference Number 0000368533 Phased rebuild of Thornton High School and the rebuild of the North wing of Future Forward @ Bollman (the Project). Both buildings share the same campus, which will be fully occupied throughout the Project. Qualifed CM/GC's must have project history of similar size, scope, relevance and budget (no less than a $75M construction cost) within the past six (6) years, in the State of Colorado. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Question Deadline 01/10/2025 at 10:00 AM MT Questions are submitted online No , Submit All Questions via Email to kelly.mickelson@adams12.org.

Sub-Bidding

Educational

$88,000,000.00

Public - County

New Construction, Site Work

55

5

10

7

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

June 22, 2026

Project location map

9351 Washington St, Thornton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.