BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Sapulpa, Oklahoma. Completed plans call for site work for a playground / park / athletic field.

10C Athletic Lockers (Rebid) 32B Fencing (Rebid) Bidders shall include specified work listed in each bid package, affidavits, bid security, and shall include the following scope of work/items listed below. The Scope of Work shall include, but is not limited to the following general items: 1) Contractor to perform all work in the Bid Package and associated work described elsewhere in the Plans and Specifications including all labor, material, permits, tools, equipment, hoisting, safety and fall protection, scaffolding, layout, etc. needed to complete the Bid Package per the plans and specifications and any applicable regulations (including OSHA regulations), codes, and recognized industry standards to provide a complete assembly for the intended use as most broadly defined. 2) All submittals, shop drawings, samples and mock-ups required by the contract documents must be submitted within 10 calendar days of the Notice of Award of the Contract. 3) Furnish all licenses and permits and arrange for inspections and required testing as required by and for this contractor's work. 4) Protection of adjacent surfaces and repair of any damage caused by the work of the contractor. 5) Subcontractor agrees to provide manpower and equipment necessary, as required by the CM Master Schedule, to provide additional crews, equipment, etc and or overtime necessary to maintain the schedule if contractor falls behind for any reason. After 24 hours written notice, there will be a $250 liquidated damages clause for each day the contract is not completed. 6) Contractor to provide for its employees all necessary safety training and fall protection asrequired by authorities having jurisdiction. 7) Provide all scaffolding, work platforms, equipment and supplies to complete all work performed in this contract. 8) Coordinate material deliveries with construction manager and provide employee to receive deliveries. 9) Contractor shall perform DAILY CLEAN UP his work and work area to maintain safe working conditions on the project, including but not limited to excess material, lunch trash and dirt and debris on streets and sidewalks. All trash generated from this contractor's work or forces shall be removed by contractor's own forces and equipment for placement in on-site dumpster provided by others. 10) Contractor shall attend weekly project coordination meetings while performing work on the site

Sub-Bidding

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - City

Site Work

6

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
51
Bidding Soon
708
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 19, 2024

img_map_placeholder

1611 S Wickham Rd, Sapulpa, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.