BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in El Centro, California. Completed plans call for the renovation of a educational facility.

-Contractor shall provide all materials, supplies, and labor to complete the work outlined below. All materials and supplies utilized shall be in new condition. The Contractor shall not re-purpose or otherwise utilize any existing data cabling, outlets, or connections without the approval of the District. - Contractor shall install, terminate, label and secure Category 6A or 8 STP Plenum grade cable from patch panels to termination points throughout the sites as outlined by the District. See Attachment D. Total number of data wall drops: 1347 at 4 Sites (Wilson, Kennedy, De Anza, Sunflower). - Location of network nodes in Classrooms, Offices, MPR, and Resource rooms will be defined by actual cabling setup. - District will provide the network cable, keystones, patch pannels, patch cords, phone faceplates. - Contractor will install and terminate the cables providing all necessary conduits, raceways, boxes and accessories. - All cabling must adhere to ANSI/TIA/EIA 568-B standards and industry best practices following TIA. - All cabling must be organized and secured. - Contractor will follow all industry standard safety rules, regulations, and guidelines. - Contractor is responsible for the cleanup and disposal of refuse generated in the performance of their duties. - The Contractor shall repair or replace any items they may have damaged or destroyed during the performance of this task. e.All work, deliveries and testing will be conducted during normal business hours unless otherwise scheduled with the District. Classification C-7 (Low Voltage Systems Contractor) The District reserves the right to accept or reject any and all quotes and reserves the right to waive any informality in any quote. Any questions please contact Alberto Contreras at 760-335-5150 or email acontreras@ecesd.org

Post-Bid

Educational

$600,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
114
All Active Projects
59
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

December 20, 2024

img_map_placeholder

Multiple Locations, El Centro, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.