Renovation of an educational facility in Oswego, New York. Completed plans call for the renovation of a educational facility.

All bidders must present evidence of skill, experience and financial qualifications per Information to Bidders, Section 7 of the project specs. Subcontracting is permitted (Section 2.18 of SUCF Agreement). Principal subcontractors must be named within 48 hrs after bid opening per Information for Bidders Section 8. Bidders must submit within 48 hrs either certification of its NYS VendRep questionnaire (preferred) or a signed and notarized paper CCA2 form (Version 9/13 only), Attachments A, B, and C, Appendix A form, work descriptions, and preliminary project schedule. EEO goals for this project: 6% minority workforce and 3% female workforce Minority Owned Sub-Contracting Goal: 5% Women Owned Sub-Contracting Goal: 5% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Contract term: 644 calendar days after receipt of the Notice to Proceed Estimated Range; $2,500,000 - $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work to be Done: a. The Work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of SUCF Project No 101029- 00 titled Renovate Exterior - Tyler Hall and carrying out all of the duties and obligations imposed upon the Contractor by the Contract Documents. b. The main features of the Work shall include, but not be limited to the following: The Tyler Hall Exterior Renovation is an exterior building facade restoration project and completes a full building renovation of Tyler that has been phased over the last 10+ years. The identified scope of work includes the removal and replacement of original windows, cleaning, repair and coating over precast panels and exterior concrete, and removal of mosaic artwork. Hazardous material removals will be required.

Award

Educational

$2,020,000.00

Public - State/Provincial

Renovation

32

18

7

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Periodic Work Observation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Multi-Outlet Assemblies, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
80
Bidding Soon
1,012
All Active Projects
476
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

February 10, 2025

img_map_placeholder

7060 NY 104, Oswego, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Suny Oswego - Renovate Exterior - Tyler Hall

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.