Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Phoenix, Arizona. Completed plans call for site work for a road / highway.
The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the Scenario 9 Transmission Main Rehabilitation project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The transmission main is located on Roeser Road from 4th Street to 9th Street. The estimated construction cost is $9 million. Scope Meeting: December 2024 PROJECT DESCRIPTION :The Scenario 9 Transmission Main Rehabilitation project involves steel slip-line rehabilitation of 2,700 linear feet of the 48-inch diameter Pre-stressed Concrete Cylinder Pipe (PCCP) Transmission Main Scenario 9 along Roeser Road from 4 th Street to 9th Street. Of all the City's PCCP Transmission Main Scenarios, Scenario 9 has the third highest percentage of pipes with wire breaks. Mitigation of the most severely distressed pipes was accomplished with replacement of Pipe #470 and carbon fiber reinforced polymer (CFRP) repair of sixteen other Scenario PCCP pipes during fiscal year 2017. However, as CFRP repair is considered a medium-term, temporary rehabilitation technique, rehabilitation in-place with welded steel sliplining is recommended. SCOPE OF WORK: The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods, and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format or it will not be accepted. A. Preconstruction phase services by the CMAR may include: o provide detailed cost estimating and knowledge of marketplace conditions o provide project planning and scheduling o provide for construction phasing and scheduling that will minimize interruption to City operations o provide alternate systems evaluation and constructability studies o advise City on ways to gain efficiencies in project delivery o provide long-lead procurement studies and initiate procurement of long-lead items o assist in the permitting processes o participate with the City in a process to set a goal for local and SBE participation and implement the local and SBE process o protect the City's sensitivity to quality, safety, and environmental factors o advise City on choosing green building materials. B. Construction phase services by the CMAR may include: o construction per final plans and specifications o select subcontractors/suppliers for this project o prepare a Guaranteed Maximum Price (GMP) proposal that meets the approval of the City o coordinate with various City of Phoenix departments, other agencies, utility companies, etc. o arrange for procurement of materials and equipment o schedule and manage site operations o bid, award, and manage all construction related contracts while meeting City bid requirements including the local and SBE participation goal o provide quality controls o bond and insure the construction o address all federal, state and local permitting requirements o deal with City issues o maintain a safe work site for all project participants Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager. o The CMAR will be required to maintain all project records in electronic format. o The City provides an ASP web-based project management database which the CMAR will be required to utilize in the fulfillment of the contract requirements. o The CMAR shall provide a computerized networked office platform with broadband internet connectivity. o UNIFIER training will be provided through the City of Phoenix to firms under contract. A maximum of 12 pages is permitted to address all content in the SOQ submittal (Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.) Questions pertaining to this selection process or contract issues should be directed to the Contract Specialist, Liz Blakley at (602) 495-3654. Page size must still meet requirements of 8 1/2 " x 11" Font size must not be less than 10 point Content count: Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above. Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above. Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.
GC Bidding
Water / Sewer
$9,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 15, 2024
July 15, 2025
E Roeser Rd, Phoenix, AZ
Related To This Project
Phoenix, AZ
Bid Date: Nov 15 2024
Phoenix, AZ
Bid Date: Nov 05 2024
Phoenix, AZ
Bid Date: Nov 12 2024
Phoenix, AZ
Bid Date: Nov 14 2024
Phoenix, AZ
Bid Date: Nov 08 2024
Phoenix, AZ
Bid Date: Dec 03 2024
Phoenix, AZ
Bid Date: Nov 19 2024
Phoenix, AZ
Bid Date: Oct 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.