BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated February 25, 2025

Site work and paving for a mixed-use development in Hornersville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Description: Hornersville Swamp: Construction of two gravel parking lots and one articulated concrete block mat boat ramp located at the Hornersville Swamp Conservation Area. Work generally will include clearing and grubbing, erosion control, grading, compaction of fills, rip rap placement, gravel placement, concrete ADA parking areas, signage, articulated concrete block mat placement, achieving finish grade per plan documents, and other Work, incidental or otherwise, as indicated in the Contract Documents. Warbler Woods: Construction of one gravel parking lot located at the Warbler Woods Conservation Area. Work generally will include clearing and grubbing, erosion control, grading, compaction of fills, rip rap placement, gravel placement, achieving finish grade per plan documents, and other Work, incidental or otherwise, as indicated in the Contract Documents. Site Directions: From Rives, take Highway 164 west approximately 1 mile, turn left (south) on Hwy TT for 4.3 miles, turn right (west) onto County Road 726 for 2.5 miles until you reach the levee bordering the east side of the Conservation Area. Turn right to the access the North Parking lot (1 mile North) or turn left to access the South Parking Lot/Boat Ramp (2 miles). Est. Value Notes: Range: $380,000 - $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidding Questions: Laura Buchanan, Contract Specialist Phone No. 573-522-4115 Ext. 3727, or Fax 573/522-2324 E-mail laura.buchanan@mdc.mo.gov B. Design Questions: Jacob Novak, Project Manager Phone No. 573-522-4115 Ext. 3725 or Fax 573-522-2324 E-mail Jacob.Novak@mdc.mo.gov C. Construction Project Joaquin Marquez, Construction Project Manager Manager: Phone No. 573-619-9847 or Fax 573-522-2324 Email joaquin.marquez@mdc.mo.gov ERAL INFORMATION A. The State reserves the right in its sole discretion to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn after the time specified for bid opening time. B. The provisions of Sections 290.210 to 290.340 shall not apply to the construction of public works for which either the engineer's estimate or the bid accepted by the public body for the total project cost is in the amount of seventy-five thousand dollars or less. C. For public works projects that exceed $75,000, the Contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the MO Dept. of Labor and Industrial Relations and as set out in the detailed plans and specifications. D. Bid results are available through QuestCDN after bid review is complete on the day of the bid opening Question Deadline 11/14/2024 No oral interpretations will be made to any bidder as to the meaning of the plans and specifications or the acceptability of alternate products, materials, form or type of construction. Every request for interpretation shall be made in writing and submitted with all supporting documents not less than seven (7) calendar days before opening of bids. The request shall be sent directly to the Infrastructure Management Branch, Missouri Department of Conservation, 2901 West Truman Blvd., P.O. Box 180, Jefferson City, Missouri 65102

Award

Sidewalks / Parking Lot

$508,794.00

Public - State/Provincial

Paving, Site Work

27

12

4

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 8, 2025

Project location map

MO-164, Hornersville, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.