Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Pine Bluff, Arkansas. Conceptual plans call for the renovation of a 84,404-square-foot educational facility.
Architects Hazzard Gymnasium Renovation Project Phase II The Gymnasium is Located on the Maincampus of the University Ofarkansas at Pine Bluff, Arkansas. The Hazzard Gymnasium, An84,404 Square Foot Facility, Wascompleted in the Early 1950s and Served as the Home of the Golden Lion Basketball Team Until 1984.as the Largest Seated Gatheringspace on the Campus at One Time,the Hazzard Served as More Than a Basketball Gym. It Has Served as a Concert Hall, an Auditorium, Aworkout Facility, an Athletic Equipment Storage Site, and a Reserve Officer Training Corps (Rotc)training Site. The Hazzard Currently Serves as the Training Siteof the Reserve Officer Trainingcorps (Rotc) Program. It is Alsohome of the Lady Lion Soccerteam/locker Room and It is an Integral Part of the Educational and Athletic Programs of the University. Project Scope Uapb Hazzard Gymnasiumrenovation Phase Ii Project Encompasses a Comprehensiverange of Improvements, From Ensuring Compliance With Buildingcodes and Life Safety Standards to Enhancing Accessibility, Functionality, and Aesthetics. The Proposedrenovations Will Provide a Modern,comfortable, and Inclusive Environment for Users, Meeting Theevolving Needs of the Uapb Hazzard Gymnasium. The Proposedrenovations Will Allow Cadets,commanders, Officers, Stakeholders, and Various Constituents Toexperience a Wholesome, Holistic Environment to Engage in Educational, Training, and Wellness Activities. Phase Ii of the Project Which Includes Renovations and Upgrades to Offices, Classrooms, Bathrooms,hvac Systems, and Ensuringeverything is Within Ada Compliance. Phase 3 Will Begin Mid2026. The Total Project Cost is Currently Estimated at $7 Million and Would Be Implemented Over Multiple Phases. Phase 2 Totals $2million. Architects Will Work With Facilities Management and The building Manager to Implement the Project. All Respondents Will Be Notified of the Results by Email, So Please Provide Accurate Contact Information. Address Eight (6) Copies of Responses to: Alisha Lewis, Procurement Official University of Arkansas at Pine Bluff 1200 N. University Drive Administration Building-office#102 Pine Bluff, Arkansas 71601 Statements of Qualification Will Be Reviewed by a Selection Committee Using a Standardized Design Services Shortlist Evaluation Form. Format Requirements: Printed Responses Should Be No Larger Than 8.5in X 11in, Limited to 50 Sheets Maximum (100 Pages), Fully Recyclable (I.e. No Plastic Covers, Plastic Tabs, Etc.) and Bound With Glue, Staples, or Thread (I.e. Perfect Bound, Saddle Stitching,etc.). No Metal or Plastic Coils Allowed. Responses That Do Notmeet These Requirements Will Bedisqualified. Please Send a Digital Copy Ofthe Response via Email Tolewisal@uapb.edu in Addition To the Printed Booklets. To Avoid Potential Conflicts Of interest, Respondents Should Not Communicate With University Faculty or Staff About This Project. This document Provides the Relevant information for Assembling A statement of Qualifications. If You Have Urgent Questions, You Cansend Them via Email Tolewisal@uapb.edu. Content Requirements: Include the Information Belowand Organize It in an Easily Accessible Manner. You Do Not Need to Divide the Response Into Chapters Exactly Matching the Description below. Responses That Do Not Include the Required Licensure Information Will Be Disqualified. 1. Proof of Licensure or Eligibility: Architects: All Firms Shall Be Licensed, or Eligible for Licensure, In the State of Arkansas. Eligiblefirms Not Currently Licensed Inarkansas Must Send a Letter to the Arkansas State Board of Architects (501-682-3171/501-682- 3172 Fax) Stating Their Intent Torespond to an Rfq Issued by Theuniversity of Arkansas at Pinebluff. Please Include Project Name, Submittal Date, and Proof of Valid Ncarb Certification in the Letter. consulting and Joint Venture Firms are Also Required to Be Licensed by the Arkansas State Board of Architects. The method of Contractor Selection has not been Determined at this time. Notification to the State board Must Be Made Prior to Responding to This Solicitation and a Copy of Either a Validarkansas License or the Letter of Intent to the Stateboard Described Above for All Team Member Firms Must Be Included With the Response. The Final Selected Firm(S)will Have 30 Days to Make Application for Corporate Licensure after They Are Awarded Thecontract. 2. Organization Chart for Designteam and All Consultants 3. Specific Project Experience(Within the Past Five Years) With Integrating Mechanical Systems Intoexisting Buildings 4. Specific Project Experience(Within the Past Five Years) With Institutional-quality Interior Design and Architecture, With Particularemphasis on Integrating Mechanical Systems Into Existing Spaces 5. Current Office Size, Personnel Description and Projected Workload 6. Experience Constructingprojects Under Nationally-recognized Sustainable Rating Systems 7. Experience With Fully Commissioned Projects 8. Proof of Current Professional liability Insurance Coverage($1,000,000 Minimum Required) 9. List of Projects Currentlyunder Contract With State Agencies or Educational Facilities 10. Statement of Diversity in Theworkforce, if Applicable 11. Certificate of Womenowned or Minority-owned Business, if Applicable Professional Services Required Feasibility, Assessments, graphic Presentation, Interior Design, Cost Evaluation, schematic Design, Design Development, Construction documents, Construction administration, and Project closeout.
Conceptual
Educational
$7,000,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2025
1200 University Dr, Pine Bluff, AR
Related To This Project
Pine Bluff, AR
Bid Date: Nov 08 2024
Pine Bluff, AR
Bid Date: Nov 12 2024
Pine Bluff, AR
Bid Date: Oct 22 2024
Pine Bluff, AR
Bid Date: Oct 23 2024
Pine Bluff, AR
Bid Date: Oct 15 2024
Pine Bluff, AR
Bid Date: Sep 26 2024
Pine Bluff, AR
Bid Date: Aug 20 2024
Pine Bluff, AR
Bid Date: Aug 15 2024
Pine Bluff, AR
Bid Date: Aug 15 2024
Pine Bluff, AR
Bid Date: Jul 25 2024
Pine Bluff, AR
Bid Date: Jul 29 2024
Pine Bluff, AR
Bid Date: Jul 18 2024
Pine Bluff, AR
Bid Date: Jul 11 2024
Pine Bluff, AR
Bid Date: Jul 17 2024
Pine Bluff, AR
Bid Date: Oct 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.