BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of an educational facility in Cincinnati, Ohio. Conceptual plans call for the construction of a educational facility; and for site work for a educational facility.

Project Description Cincinnati State seeks to finalize programming for Phase 1, also known as the "Main Street Renovation" of its Clifton Campus Master Plan at 3520 Central Parkway, Cincinnati, OH. The Clifton Campus is comprised of the Advanced Technology and Learning Center (ATLC), the Health Professions Building (HPB), and the Main Building. These facilities were constructed between 1952 and 2004 and house approximately 700,000 SF of learning, meeting, and program space. Phase 1 projects will consist of multiple suites in the ATLC and Main Building, with the bulk of the work comprising student-facing suites along the first-floor main corridor of the Main Building. The College seeks to modernize this first floor corridor, and refers to it as its Main Street project, as determined in a 2022 study performed by KZF. Submit all questions regarding this RFQ in writing to Steve Morris at steve.morris@cincinnatistate.edu. Questions will be answered and posted to the Opportunities page on the OFCC website at online. Total Project Cost $50,000. Planning Services Start 12 / 24. Planning Services Completed 02 / 25. The College requests qualifications for an Architect/Engineer to provide Basic Programming Services, Schematic Design, Design Development, and Extra Services and Additional Services of all Types as may be needed to execute this project. This design and development phase of the project is separate from the construction phase(s) which will potentially be solicited for completion immediately following the at the conclusion of this engagement. The total project square footage is approximately 16,000-20,000 SF of space and includes: A new open stair at the intersection of the Main Building Basketball Gym, Main Entrance, and Lower Level Gym. Student Facing Office Suites for CAP and SS Programs on the first floor of the Main Building. Bookstore, Student Collaboration Spaces, Food Pantry, and Clothing Closet on the first floor of the Main Building.. Administrative office suites for Marketing, Human Resources, Finance, and Vice President of Administration in the ATLC Building.

Conceptual

Educational

$50,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
85
Bidding Soon
1,250
All Active Projects
510
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

img_map_placeholder

3520 Central Pkwy, Cincinnati, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.