BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 13, 2024 at 7:00 PM

Updated December 14, 2024

Site work and paving for a mixed-use development in South Bloomfield, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes the following Work: Widening existing road and installing curb and gutter for 0.33 miles along US 23 (Walnut Street) between SR 316 East (Ashville Road) and SR 316 West (North Street). Storm sewer will be replaced along US 23 with storm sewer improvements extending west 800 feet along 2nd Street. Resurfacing through intermediate course will be included with this project. Signal modifications include unlashing and relashing existing span wire, signal head upgrades, and traffic signal controller modifications. The Bid must be accompanied by Bid Guaranty and Contract Bond for the full amount of the Bid or Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. CONTRACTOR shall pay wages to each laborer and mechanic at a rate not less than the minimum wages specified in the current wage determination as published by the State of Ohio Department of Commerce. The Work is being funded by loan and grant funding from the Ohio Public Works Commission and local funds. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 60 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. For all further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents. Question Deadline 11/15/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. All requests for interpretation must be received at least five days prior to the day set for receiving Bids WIDENING EXISTING ROAD AND INSTALLING CURB AND GUTTER 0.33 Ml ALONG WALNUTST. (US 23) BETWEEN SR 316 EAST (ASHVILLE ROAD) AND SR 316 WEST (NORTH STREET). STORM SEWER WILL BE REPLACED ALONG US 23 WITH STORM SEWER IMPROVEMENTS EXTENDING WEST 800 FEET ALONG 2ND STREET. RESURFACING THROUGH INTERMEDIATE COURSE, WILL BE INCLUDED WITH THIS PROJECT

Award

Roads / Highways

$2,199,038.00

Public - City

Paving, Site Work

89

18

7

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
102
Bidding Soon
2,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

December 20, 2024

Project location map

US-23, South Bloomfield, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.