Published December 29, 2024 at 7:00 PM

Updated December 30, 2024

Renovation of a fire / police facility in Winnipeg, Manitoba. Completed plans call for the renovation of a fire / police facility.

Extension of Radio Frequency Shield (Phase 1) and Interior Door Replacement (Phase 2) - WPS HQ - 245 Smith Street The Work to be done under the Contract shall consist of installation of a new RF Shielding Vestibule and Main Floor Elevator Lobby Door replacement as per drawings and specifications. The major components of the Work are as follows: (a) Demolition of existing RF Shielding Vestibule P1121A and all related electrical components as per drawings and specifications. (b) Construction of new RF Shielding Vestibule P1121A enclosure as per drawings and specifications. (c) Complete enclosure to include walls, floors ceiling and access door as per drawings and specifications. (d) Reinstall/relocate existing card access hardware, thermostat, new electrical components as per drawings and specifications. (e) Ensure all new/relocated components are tested and operate properly. (f) Contractor to mitigate dust in the area as it will remain partially occupied during construction. Floor to ceiling hoarding within work area is required. (g) Replace existing Main Floor Elevator Lobby Door with new Fire Rated Door as per drawings and specifications. (h) Existing Grille above door to be removed and opening infilled as per drawings and specifications. The funds available for this contract are $110,000.00. A Performance Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Form Attached to These Supplemental Conditions (Form H1: Performance Bond), in the Amount of Fifty Percent (50%) of the Contract Price; and (B) a Labour and Material Payment Bond of a Company Registered to Conduct the Business of a Surety in Manitoba, in the Form Attached to These Supplemental Conditions (Form H2: Labour and Material Payment Bond), in an Amount Equal to Fifty Percent (50%) of the Contract Price; or Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Award is subject to final approval

Award

Fire / Police

$123,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
44
Bidding Soon
536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 21, 2025

Project location map

245 Smith St, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.