BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Belchertown, Massachusetts. Completed plans call for site work for a water / sewer project.

The work involves the removal of the existing parts, fittings and finishes and replacement with new parts, fittings and finishes. The work of this Contract includes all labor and materials necessary to complete all work required for the Elevator Repairs at Belchertown Town Hall, 2 Jabish Street Belchertown, MA 01007 in accordance with the Contract Documents as prepared by Roy S. Brown, Architects, 85 Chilson Road, Wilbraham, Massachusetts subject to additions and deductions according to the terms and conditions of the Contract. Included under the scope of work of this section is the replacement of any existing construction damaged during the course of the job. The General Contractor for this project will be responsible for the following scope of work items: a. Provide and install all staging, lifting, hoisting, and protection. b. Remove existing parts and finishes scheduled to be replaced. 2 Supply and install replacement parts and finishes for the three stop elevator as listed in Section 14.24.00. 3 Bidders are reminded that not every detail of construction can be shown on the drawings and that not every part of every assembly can be listed in the specifications. The owner assumes that bidders are experienced tradesman who estimate and supply all the required materials for their trades as having visited the site prior to bidding. 4 Protect all existing finishes to remain during construction. Contractor is responsible for repairing any and all existing finishes damaged during construction to the architect's and owner's satisfaction. This includes all finishes damaged in the course of accessing the work areas, both interior and exterior. 5 All contractors are to field verify all existing conditions and dimensions prior to bidding. Any discrepancies are to be reported to the Architect immediately. 6 Disposal of items not scheduled for relocation or reuse, or not scheduled for return to Owner. Return items to Owner as noted. 7 Contractor will be responsible for all other work that is shown in the Contract Documents that is not specifically identified to be that of others, including all work that is shown in the Contract Documents that is not identified as being any Contractor's specific responsibility. 8 The Contractor will be responsible for all cutting and patching to match all existing finishes affected by this project. 9 Furnish and install all other new construction as indicated in the Contract Documents. 10 Provide Owner with detailed schedule of construction. Coordinate construction with needs of Owner and occupants of units affected.

Bid Results

Water / Sewer

$122,600.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
174
Bidding Soon
3,161
All Active Projects
1,189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

December 16, 2024

img_map_placeholder

2 Jabish St, Belchertown, MA

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.