BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Newburyport, Massachusetts. Completed plans call for the renovation of a educational facility.

Project The Town of Newbury is seeking written quotes from qualified contractors for the historic schoolhouse window repair/restoration. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Town of Newbury is seeking written quotes from qualified contractors for the historic schoolhouse window repair/restoration project. The historic schoolhouse is located at the Lower Green at the corner of Newman and High Roads in Newbury, MA The six windows on the first floor are six-over-six double hung wood windows. The windows (both sashes) are about 76" high by 36" wide. The muntins are approximately 1/2 " wide. Some of the panes are older glass and some are replacement glass. The one attic window is also six-over-six approximately 56" high by 30" wide (both sashes). The muntins are approximately 5/8" wide. 1. Remove the windows and provide a weather-proof covering for the openings. 2. Remove all old glazing and paint. 3. Remove all panes. Provide replacement glass as needed. Customer may be able to source period glass. 4. Clean and sand the rabbets. 5. Repair or replace any rotten or cracked wood. 6. Sand all faces. 7. Stabilize the corners of the frames by re-pinning and/or regluing as needed. 8. Treat rabbets and sashes inside and outside with 70% linseed oil and 30% turpentine. Allow to dry. 9. Bed the rabbets with oil-based glazing compound. 10. Reinstall glass and secure with glazing points. 11. Apply glazing to the muntin over the pane and allow to cure 7-10 days. 12. Prime with an oil-based primer inside and out. 13. Finish paint the outside surfaces with an oil-based paint matching the green color of the doors. 14. Seal inside frames and muntins with an oil-based tinted satin varnish, covering any glazing compound that shows through the glass. 15. Any repair work on sills, sash weights, pulleys, etc. will be performed by the Historical Commission. 16. Remove temporary coverings and reinstall sashes.

Sub-Bidding

Educational

$17,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
159
Bidding Soon
2,295
All Active Projects
1,076
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

December 13, 2024

img_map_placeholder

Newman Rd & High Rd, Newburyport, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.