BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Dixon, Illinois. Contact the soliciting agency for additional information.

This project requires 33% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 23, 2025, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required to provide Materials Technician(s) (Office/Field/Lab) for various materials inspection for various projects in District Two. The Consultant will provide support for various IDOT materials functionality, technical office work, inspection, and field/lab processes throughout District Two. The position(s) will report directly to District Two headquarters located in Dixon, IL. each day to perform tasks and/or receive assignments, unless assignments are given in advance which require reporting to an alternate location. This work may involve working directly with contractors, producers, suppliers, local agencies and/or other consultants. The estimated engineering fee for this project is $3,000,000. The completion date for this contract will be 60 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Special Services (Quality Assurance HMA & Aggregate) Special Services (Quality Assurance PCC & Aggregate) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 19 - RFP - Various Phase III Materials Inspection (PCC, HMA, Prestressed Precast Concrete, Aggregate & Soils), Various Routes

Conceptual

Roads / Highways

$3,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
39
Bidding Soon
889
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

img_map_placeholder

Multiple Locations, Dixon, IL

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.