Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Dixon, Illinois. Contact the soliciting agency for additional information.
This project requires 33% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 23, 2025, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required to provide Materials Technician(s) (Office/Field/Lab) for various materials inspection for various projects in District Two. The Consultant will provide support for various IDOT materials functionality, technical office work, inspection, and field/lab processes throughout District Two. The position(s) will report directly to District Two headquarters located in Dixon, IL. each day to perform tasks and/or receive assignments, unless assignments are given in advance which require reporting to an alternate location. This work may involve working directly with contractors, producers, suppliers, local agencies and/or other consultants. The estimated engineering fee for this project is $3,000,000. The completion date for this contract will be 60 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Special Services (Quality Assurance HMA & Aggregate) Special Services (Quality Assurance PCC & Aggregate) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 19 - RFP - Various Phase III Materials Inspection (PCC, HMA, Prestressed Precast Concrete, Aggregate & Soils), Various Routes
Conceptual
Roads / Highways
$3,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
Multiple Locations, Dixon, IL
Related To This Project
Dixon, IL
Bid Date: Nov 11 2024
Dixon, IL
Bid Date: Oct 24 2024
Dixon, IL
Bid Date: Dec 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.