BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2024 at 7:00 PM

Updated December 5, 2024

This is a service / maintenance or supply contract in Kiln, Mississippi. Contact the soliciting agency for additional information.

Kiln Utility and Fire District (Owner) is requesting Bids for the construction of the following Project: Equipment - Grinder Pump Package For the Jourdan River Shores Sewer Improvements Phase 1 Each bid shall be accompanied by a Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Mississippi, in the amount of five percent (5%) of the total bid price, payable to the owner as bid security. Bidders shall also submit a current financial statement, if requested by the Owner. The successful bidder will be required to furnish a Performance Bond and a Payment Bond each in the amount of one hundred percent (100%) of the contract amount. The required documents shall be submitted in a sealed envelope and the outside of the envelope shall be marked plainly as: Equipment - Grinder Pump Package for the Jourdan River Shores Sewer Improvements Phase 1 and the Certificate of Responsibility Number All interpretations of drawings and specifications shall be directed to Jason Chiniche at Chiniche Engineering and Surveying by email to: jason@chiniche.com. An acknowledged received copy of all Addenda issued by the Engineer via Plan House must be included with the bid proposal. No bidder may withdraw his bid within sixty (60) days after the date of actual bid opening without Owner's consent. The Owner reserves the right to reject any or all bids and to waive any or all informalities. All contracts awarded under this Advertisement will be funded in part by funds from the Mississippi Department of Environmental Quality (MDEQ) through the Mississippi Municipality and County Water Infrastructure Grant (MCWI) Program. The successful bidder will be required to comply with all MCWI Program regulations and requirements. Additional funding for the Project is from Gulf of Mexico Energy Security Act (GOMESA) and all the GOMESA funding regulations and requirements must also be adhered to.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
0
Bidding Soon
364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 3, 2025

Project location map

6383 Pontiac Dr, Kiln, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.