Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 8, 2025 at 8:00 PM
Updated April 9, 2025
This is a service / maintenance or supply contract in Chicago, Illinois. Contact the soliciting agency for additional information.
As of April 8, 2025, project has been awarded. Engineer identified. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 29, 2025, at 10:00 AM at the Region One/District One Office in Schaumburg. Engineering services are required for the preparation of a Planning and Environment Linkages (PEL) Study for the improvements of all the structures on I-90/94 (Dan Ryan Expressway) that extend east of Ohio Street to west of 31st Street. This study will be conducted in accordance with the Statewide and Metropolitan Planning Regulation 23 CFR 450 and other FHWA policy on the PEL process. This process allows early planning-level decisions that considers environmental, community, and economic goals that can be carried forward to accelerate future National Environmental Policy Act (NEPA) activities. The study may include identifying the purpose and need, logical termini, corridor definition and the transportation problem statement. Work may include but is not limited to explore financial and congestion management strategies, such as managed lanes. The Consultant will be responsible for conducting/facilitating the public involvement activities that will be conducted with the general public, local, state and federal agencies in a collaborative way to obtain input early in the process following the principles of Context Sensitive Solutions. An evaluation of the existing conditions and operational performance of the corridor, identification of future mobility and safety needs and evaluation and documentation of alternatives, which will be the basis of future environmental and preliminary engineering studies as individual projects, if any, are identified with this study. There are approximately 36 bridge structures throughout the study limits, including the Hubbards Cave and the Dan Ryan Elevated Bridge; which are both approaching the end of their service life. Innovative proposals for these structures that maximize the existing footprint and avoid impacts to the adjacent area will be part of the alternative analysis process. The completion date for this contract will be 48 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Environmental Reports (Environmental Assessment) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 06 - RFP - I-90/94 (Dan Ryan Expressway) from East of Ohio Street to West of 31st Street, Phase I Project
Final Planning
Bridges / Tunnels
$6,000,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
Dan Ryan Expy, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: May 07 2025
Chicago, IL
Bid Date: Apr 11 2025
Chicago, IL
Bid Date: May 13 2025
Chicago, IL
Bid Date: May 09 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: May 16 2025
Chicago, IL
Bid Date: Apr 25 2025
Chicago, IL
Bid Date: May 01 2025
Chicago, IL
Bid Date: May 14 2025
Chicago, IL
Bid Date: May 12 2025
Chicago, IL
--
Chicago, IL
Bid Date: May 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.