BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Folly Beach, South Carolina. Completed plans call for the renovation of a municipal facility.

Scope of Work includes, but is not limited to, the renovation (remodel and updating) of the bathrooms at the Folly Beach Fishing Pier at 101 East Arctic Avenue, Folly Beach, SC 29439. Question Deadline 11/20/2024 All questions pertaining to the bid documents shall be referred by email prcprocurement@ccprc.com. General Notes: All work will be performed in accordance with local, state and federal laws, and all appropriate permits and or licenses will be the responsibility of the contractor. 1. All work shall be in accordance with the attached scope of work and bid provided by the contractor. 2. The contractor shall maintain a safe and clean work area. The worksite shall be secured and cleaned up daily (nails, debris, equipment, etc.) 3. The contractor shall protect the surrounding area including boardwalks, sidewalks, decks and decking, vegetation, and buildings. The contractor is responsible for leaving disturbed areas as natural as possible when the project is complete. 4. The contractor is responsible for determining what permits are required for this scope of work and obtaining those permits (including fees) in accordance with local ordinances. The contractor is responsible for all required site and building inspections. 5. The Contractor shall follow all applicable city, county, state and federal codes and regulations. 6. The contractor is responsible for ensuring completed project meets or exceeds all standards and specifications in accordance with the Americans with Disabilities Act Accessibility Guidelines (ADAAG) and the 2010 Standards for Accessible Design. This includes, but is not limited to, all doorway changes in level, amount of force needed to open door, door closing speed, and door hardware and height. 7. The Contractor shall provide all tools, equipment products and materials necessary to complete the project. 8. The contractor is responsible for obtaining and verifying all measurements. 9. The Contractor shall: A. Floors: Existing flooring to be removed to facilitate subfloor replacement to allow proper slope to floor drains. New Plexi-Chemie's Epoxy Flooring System seamless epoxy flooring to be installed. Floor drains and the

GC Bidding

Municipal

$35,000.00

Public - County

Renovation

1

7

7

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
50
Bidding Soon
491
All Active Projects
230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

January 2, 2025

img_map_placeholder

101 E Arctic Ave, Folly Beach, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.