BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Renovation of a fire / police facility in Folly Beach, South Carolina. Completed plans call for the renovation of a 7,000-square-foot fire / police facility.

Public Safety Interior Flooring Replacement The City of Folly Beach is seeking proposals from qualified Contractors, to provide approximately 7000 square feet of interior flooring replacement for the 2nd floor interior spaces at the Folly Beach Public Safety Building, 106 W. Cooper Ave, Folly Beach South Carolina. Provide the following options: Option 1-Remove all VCT flooring, vinyl cove base, and carpet. Prepare concrete slab in accordance with LVT flooring manufacturers installation instructions and install LVT flooring, 1x8 wood baseboard, and 3/4" wood quarter round in all areas of the 2nd floor, excluding the FB dispatch office, electrical room, evidence rooms, and lavatories. Option 2-Remove all VCT flooring, vinyl cove base, and carpet. Slab prep and installation of a polished concrete finished floor to include installation of 1"x8" wood base and wood 3/4" quarter round trim excluding the FB dispatch office, electrical room, evidence rooms, and lavatories. (Painting will be handled separately by owner.) Contractor must pass a FBDPS background check. Questions may be emailed no later than November 20, 2024, to Wes Graham: wgraham@follybeach.gov. Answers will be provided to all bidders that have emailed Mr. Graham on November 26, 2024. Provide the following options: Option 1-Remove all VCT flooring, vinyl cove base, and carpet. Prepare concrete slab in accordance with LVT flooring manufacturers installation instructions and install LVT flooring, 1x8 wood baseboard, and 3/4 " wood quarter round in all areas of the 2 nd floor, excluding the FB dispatch office, electrical room, evidence rooms, and lavatories. Option 2-Remove all VCT flooring, vinyl cove base, and carpet. Slab prep and installation of a polished concrete finished floor to include installation of 1"x8" wood base and wood 3/4 " quarter round trim excluding the FB dispatch office, electrical room, evidence rooms, and lavatories. Painting will be handled separately by owner.

Award

Fire / Police

$42,682.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
2
Bidding Soon
432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

February 28, 2025

Project location map

106 W Cooper Ave, Folly Beach, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.