Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 29, 2025 at 8:00 PM
Updated August 30, 2025
Remodeling and renovation of an educational facility in Lexington, Kentucky. Completed plans call for the remodel of a 161,589-square-foot, three-story above grade educational facility; and for the renovation of a 161,589-square-foot, three-story above grade educational facility.
https://kykernel.com/114169/uncategorized/ongoing-white-hall-renovation-impacts-campus-life/ The White Hall Classroom Building’s renovation has impacted students’ security, navigation and schedules as construction operations still take place on campus. Expected to be completed in June 2026, the White Hall renovation officially started in the summer of 2024, according to the Kentucky Kernel. White Hall holds around 50 classrooms and is the most common area of ????intersection among students from all majors, the Kentucky Kernel reported. UK Vice President of Facilities Management and Chief Facilities Officer, Mary Vosevich, said she recognized the logistic downside of the current $82 million remodeling considering the building is located right in the “heart of the campus.” “We try to do whatever we can to mitigate any inconvenience that’s happening, but these are big projects,” Vosevich said. “I think the reward is going to be good when it’s all finished, but there’s going to be some inconvenience at times.” White Hall construction is still at the preliminary stages of preparing the building for renovation, which will include integrated active spaces for large group engagement to promote “learning outside the classrooms,” Vosevich said. According to Vosevich, relocating classes around the university’s campus was the biggest challenge for the 2024-25 academic year, as it involved more offices than usual, including the Registrar’s office and faculty members. Associate Dean of Students for the Residential Experience, Justin Blevins, said several UK residence halls include classroom centers as part of their original design, which has become an alternative amid the largest freshman class in UK’s history, according to the UK News website. However, Blevins said the number of classes utilizing residence hall classrooms in the Fall 2024 semester is 171—the same in Fall 2022 and “not far from” the 168 sections in Fall 2023. For UK core courses, such as UK 101, sessions currently meet in residence halls, such as Smith Hall, Woodland Glen V, Jewell Hall, Donovan Hall, Chellgren Hall and Roselle Residence Hall, according to the myUK registration page. Holding classes in dorms caused safety concerns for some students, such as Natalia Barrera, a sophomore secondary social studies education major, who said it made her worried about the access of non-residents into the dorms’ common areas. “In my dorm, I have classrooms in the basement, so every time I go to do my laundry, it’s just a bunch of people waiting outside trying to go to class,” Barrera said. “Which is strange and a little unsafe in the sense that anyone can get in from that door.” Blevins said the access of non-resident students to their classrooms in residence halls is coordinated with UKPD to ensure only direct routes to the classroom spaces. “They (UKPD) do not include access to stairwells, elevators, or any residential entry points beyond what is necessary to reach the classroom areas,” Blevins said. “Residential security remains a priority, and our systems are designed to maintain that separation.” The effect of taking altered routes between classes has also caused some students, like Celia Spurlock, a sophomore integrated strategic communications major, to drop out of courses and rearrange schedules. Spurlock said she had to drop a class in the fall of 2024 because she could not make it in time due to the long distance and “intense” traffic on campus. “They (the university) could’ve prepared a little better,” Spurlock said. “Or they could’ve done construction on one side of the building.” Even for students with majors that have their own facilities, many classes are now being held in buildings that lack the same capacity as White Hall, according to Lawrence Rayan, a junior majoring in mechanical engineering. Rayan said one of the facilities he now has to have classes in is the Funkhouser building, saying he missed having his calculus classes at White Hall, despite its “70s vibe.” Some students, like sophomore nursing major Daniela Roman, said the issue of relocating buildings involves not only “old-looking” structures, but also concerns about unsuitable classroom conditions. “Our professor had to find a room in the education building (Dickey Hall) in the basement downstairs,” Roman said. “She told us that they (maintenance staff) had to come down there and dust everything off because it hadn’t been used in so long.” According to Roman and Barrera, other projects such as building more parking areas on campus should be a priority over White Hall’s renovation. Other classroom buildings were mentioned as “needing reform,” such as the Taylor Education and the Fine Arts buildings, according to Ali King, a junior double major in dance and arts administration. “In the dance studio (Fine Arts building), the air conditioner still does not work, and it’s really hot in there all the time,” King said. ”And in the green room, there’s mold on the walls, and people sometimes get sick because of the mold, and it’s just a really old building.” In the meantime, students such as Barrera said they now fear what else is to come after the inconvenience caused by the current remodeling. “Mainly, I think this is horrible timing for the university, because my class was the largest, and now this new freshman (class) is the largest,” Barrera said. “If they’re gonna do this, what else are they gonna take away?” ---------------------- **Per Addendum 4 the bid date has been extended from 12/03/24 to 12/06/24** The purpose of this project is to remodel and renovate the existing White Hall Classroom Building located on the University of Kentucky Campus. White Hall is a 161,589 SF, 3 story with a basement concrete framed structurer. The basement is a selective construction, the first floor will house the Lecture Halls, and Floors 2 and 3 will be primarily for Classrooms. The iconic exterior of White Hall will also be receiving a quality restoration. Upon the completion of construction UK students will be reintroduced to an up-to-date exterior, and an improved interior offering state of the art lecture halls, classrooms, collaborative spaces, auditoriums, and micro-market. Custom Bid Result TP 09 General Trades EC Matthews Co., Inc. - $ 5,146,400 TP 10 Cast in Place Concrete Marrillia Design & Construction - $ 1,041,000 TP 11 Structural Steel MAK Steel Services - $ 789,000 TP 12 Architectural Woodworking The Atlas Companies - $ 786,427 TP 13 Roofing Rooflynx - $ 1,139,925 TP 14 Glass & Glazing Strong Tower Construction, LLC - $ 2,416,313 TP 15 Drywall and Ceilings Churchill McGee, LLC - $ 3,980,000 TP 16 Flooring and Tile CDI Flooring - $ 788,197 TP 17 Painting and Wall Covering Wilson Painting Company, LLC - $ 406,100 TP 18 Terrazzo Martina Bros Co., Inc - $ 992,500 TP 20 Roller Shades Best Blind & Shade - $ 171,000 TP 21 ADA Lift D C Elevator -$ 125,000 TP 22 Fire Suppression Twin Lakes Fire Service, LLC - $ 573,599 TP 23 Mechanical and Plumbing TP Mechanical Contractors LLC - $ 6,730,000 TP 24 Electrical Glenwood Electric, Inc. - $ 9,991,000 TP 25 Structured Cabling and Audio Visual Davis H. Elliot Construction Company, Inc - $ 550,000 TP 26 DFH and Access Controls Schiller - $ 911,904 TP 27 Combo General Trades & Concrete EC Matthews Co., Inc - $ 6,120,800
Bid Results
Educational
$43,214,365.00
Public - State/Provincial
Remodeling, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2024
January 10, 2025
140 Patterson Dr, Lexington, KY
Related To This Project
Lexington, KY
Bid Date: Dec 05 2024
Lexington, KY
Bid Date: Dec 10 2024
Lexington, KY
Bid Date: Dec 17 2024
Lexington, KY
Bid Date: Dec 10 2024
Lexington, KY
Bid Date: Jan 10 2025
Lexington, KY
Bid Date: Dec 04 2024
Lexington, KY
Bid Date: Dec 10 2024
Lexington, KY
--
Lexington, KY
--
Lexington, KY
--
Lexington, KY
--
Lexington, KY
Bid Date: Nov 18 2024
Lexington, KY
Bid Date: Nov 07 2024
Lexington, KY
Bid Date: Nov 13 2024
Lexington, KY
Bid Date: Nov 15 2024