Published December 10, 2024 at 7:00 PM

Updated December 11, 2024

Site work and new construction of an educational facility in Lexington, Kentucky. Completed plans call for the construction of a 563,475-square-foot educational facility; and for site work for a educational facility.

CTC AAC - BP7 - Core and Shell - Group 4 - REBID: Fireproofing, Pre-Engineered Canopy, Loading Dock Equipment and Doors Bid Package 7 Core and Shell Group 4 is the fourth grouping of bid opportunities for the new Cancer Treatment Center (CTC) and Advanced Ambulatory Center. This is the final bid opportunity related to the Core and Shell of the UK CTC. The Cancer Treatment Center and Advanced Ambulatory Center will be a state-of-the-art facility providing cancer care and research to treat patients across Kentucky. The full scope of the program is combined in 3 project parts: Upgrades to Elizabeth Street and roadways on the west side of the medical campus, Site and Utility upgrades, and a 9 level (including a mechanical penthouse) 563,475 GSF Cancer Treatment Center (CTC) and Advanced Ambulatory Center (AAC). The CTC AAC serves both inpatients and outpatients with the lower 3 floors capable of treating inpatients. The program includes Radiation Medicine, Imaging Services, Lab, Cancer Urgent Care, an Ambulatory Surgery Center, various cancer and not cancer clinics, infusion, and women's cancer services. A divided sky bridge connection will connect to Pavilion A, primarily for the movement of families, visitors, ambulatory patients, and staff. The site design provides generous, welcoming landscape space to create a distinctive healing environment. Within Group 3 are the following Trades available for bidding: o Fireproofing o Pre-Engineered Canopy o Loading Dock Equipment and Doors Future bid opportunities will be available for the interior fit out of the Cancer Center. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions The time for Substantial Completion for all phases shall be three hundred sixty-five (365) consecutive calendar days and Final Completion shall be thirty (30) consecutive calendar days thereafter. Substantial Completion will include all site restoration completed, site cleanup and fully functional. Question Deadline 11/21/2024 at 1:00 PM ET Written questions can be submitted by email to Ken Scott at cckbidquestions@uky.edu or fax to 859.257.1951. Addendum issued on or about 11/27/2024. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Bid results: Fireproofing: Rolling Plains Construction $486,840 Apparent Low. Bid results: Pre-Engineered canopy, no bids received; Loading Dock Equipment, no bids received.

Bid Results

Educational

$486,840.00

Public - State/Provincial

New Construction, Site Work

583

41

15

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Mockups, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Decorative Metal, Decorative Metal Stairs
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Composite Roof Panels, Metal Wall Panels, Composite Wall Panels, Siding, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Preformed Joint Seals, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Automatic Entrances, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Awnings
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Radiation Protection
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Packaged Water Chillers, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Underground Ducts and Raceways for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Medium-Voltage Switchgear, Medium-Voltage Fusible Interrupter Switchgear, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Unit Paving, Stone Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Segmental Retaining Walls, Irrigation, Planting, Turf and Grasses, Plugging, Plants, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Process Equipment, Process Gas Pressure Regulators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
36
Bidding Soon
786
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

February 3, 2025

img_map_placeholder

1220 Elizabeth St, Lexington, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.